You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Modeling Electron Emission and Surface Effects of High Quantum Efficiency Photocathodes

    SBC: TECH-X CORPORATION            Topic: 06a

    The successful operation of the Department of Energy (DOE) X-ray light sources, free elec- tron laser (FEL), and linear accelerator facilities depends on developing advanced photoinjectors. These require photocathodes capable to deliver high quantum efficiency (QE), high-brightness, low emittance, high-average current electron beams. Measurements have demonstrated the potential to generate e ...

    SBIR Phase II 2016 Department of Energy
  2. Multi-scale modeling for beam-beam depolarization

    SBC: TECH-X CORPORATION            Topic: 24e

    To elucidate the mysterious origins of nuclear spin, the Nuclear Science Advisory Committee (NSAC) has identified the science of electron-ion colliders, and specifically a proposed polarized electron-ion collider, as “absolutely central to U.S. science”. Such machines, estimated to cost as much as $500M–$1B, will require polarized particle beams; and high polarization improves experimen ...

    SBIR Phase II 2016 Department of Energy
  3. Hardening Advanced Methods for Predicting 3D Unsteady Flows Around Wind Turbines for Industrial Use

    SBC: CONTINUUM DYNAMICS INC            Topic: 02c

    The product concept combines stability and high gas transport of amorphous fluoropolymers with high selectivity of silver salts to create a new membrane with excellent separation, fouling resistance to sulfurous and other gases, and superb stability at high flux.

    STTR Phase II 2016 Department of Energy
  4. DEVELOPMENT OF A TOTAL PEROXY DETECTOR FOR FLAME AND COMBUSTION MEASUREMENTS

    SBC: ADA TECHNOLOGIES, INC.            Topic: N/A

    A RESEARCH AND DEVELOPMENT PROGRAM IS PROPOSED WHICH WILL DETERMINE THE TECHNICAL FEASIBILITY OF AN INSTRUMENT DESIGNED TO PROVIDE THE CAPABILITY OF MEASURING THE CONCENTRATION OF OXY AND PEROXY FREE RADICALS IN COMBUSTION STUDIES. THE DETECTOR FOR THE INSTRUMENT IS BASED ON AN AMBIENT FREE RADICAL DETECTOR WHICH USES AN AMPLIFICATION CHAIN REACTION BETWEEN THE FREE RADICALS AND CO AND NO WHICHRES ...

    SBIR Phase II 1987 Department of Energy
  5. FAST ADAPTIVE COMPOSITE GRID METHODS FOR HIGH PERFORMANCE COMPUTER SYSTEMS

    SBC: Colorado Research Development            Topic: N/A

    THIS PROJECT WILL STUDY, IN THE CONTEXT OF HIGH PERFORMANCE COMPUTER SYSTEMS, THE NEWLY CONCEIVED FAST ADAPTIVE COMPOSITE GRID METHOD (FAC) FOR NUMERICAL SOLUTION OF PARTIAL DIFFERENTIAL BOUNDARY VALUE PROBLEMS. FAC IS A METHOD FOR ADAPTING LOCAL GRIDS TO RESOLVE LOCAL PHYSICAL PHENOMENA AND FOR VERY FAST SOLUTION OF THE RESULTING DISCRETE EQUATIONS; IT CAN IMPLEMENT THE CAREFULLY DEVELOPED DISCRE ...

    SBIR Phase II 1985 Department of Energy
  6. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  7. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  8. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: Ophir Corporation            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
  9. TITANIUM NITRIDE COATING OF HIGH SPEED STEEL AND CARBIDE METAL CUTTING TOOLS USING FLUID BED FURNACE TECHNOLOGY

    SBC: Procedyne Corp            Topic: N/A

    IN THE PAST FEW YEARS, A CONSIDERABLE INCREASE IN PERFORMANCE HAS BEEN ACHIEVED FROM HIGH SPEED STEEL AND CARBIDE METAL CUTTING TOOLS BY THE ADDITION OF HARD SURFACE COATINGS SUCH AS TITANIUM NITRIDE, SILICON NITRIDE ,TITANIUM CARBIDE, ALUMINUM OXIDE AND VARIOUS COMBINATIONS OF THE ABOVE. THESE COATINGS ARE DIFFICULT TO APPLY UNIFORM LY, PARTICULARLY IN THE CASE OF COMPLEX GEOMETRIES AND ARE EXPEN ...

    SBIR Phase II 1985 Department of Energy
  10. ASSESSMENT OF 10(14) GATE-HZ/CM(2) CHARGE-MODE LOGIC FOR SUPERCOMPUTERS

    SBC: Q-DOT, INC.            Topic: N/A

    CHARGE-MODE DIGITAL LOGIC APPEARS TO HAVE GREAT POTENTIAL AS A BUILDING BLOCK FOR FUTURE SUPERCOMPUTERS. ITS EXTREMELY HIGH COMPUTATIONAL DENSITY, ESTIMATED AT 2 X 10(14) GATE-HZ/CM(2), IS ACHIEVABLE AT 2 MINIMUM FEATURES USING CONVENTIONAL, OPTICAL LITHOGRAPHY. BY CONTRAST, DOD'S VHSIC II PROGRAM GOAL IS 1 X 10(13) GATE-HZ/CM(2) AND REQUIRES 0.5 UPSILON M FEATURES. WITH CHARGE-MODE LOGIC, MORE TH ...

    SBIR Phase II 1985 Department of Energy
US Flag An Official Website of the United States Government