You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  2. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  3. HUMAN PRESENCE DETECTION IN VEHICLES

    SBC: ENSCO Inc            Topic: N/A

    AN EXISTING SYSTEM HAS DEMONSTRATED, IN QUIET CONDITIONS, VERY RELIABLE DETECTION OF HUMANS HIDDEN IN VEHICLES. SEISMIC VIBRATIONS ARE THE MAJOR, UNAVOIDABLE LIMITATIONS. MEASUREMENT OF THE SEISMIC VIBRATIONS AND COHERENT ANALYSES WILL BE UTILIZED TO COMPUTE AND SUBTRACT THE EFFECT OF THE SEISMIC INTERFERENCE ON THE VEHICLE MOTION. THE PHASE I EFFORT WILL IMPROVE THE RELIABILITY, INCREASE THE S ...

    SBIR Phase I 1994 Department of Energy
  4. RELIABLE INTRUSION DETECTION

    SBC: ENSCO Inc            Topic: N/A

    RELIABLE INTRUSION DETECTION MAY BE ACHIEVED BY COMBINING GENERALIZED POTENTIAL FUNCTION (GPF) NEURAL NET CONSTRUCTION AND MULTIPLE SENSOR DATA FUSION. TRADITIONALLY, RELIABLE INTRUSION DETECTION CAN BE DIFFICULT BECAUSE NOISE LEVELS CHANGE WITH TIME AND LOCATION, AND AN INTRUSION MAY PRODUCE A WIDE RANGE OF SIGNALS OR VARIATIONS OVER THE DIFFERENT TYPES OF SENSORS. ACCOMMODATING THESE VARIATION ...

    SBIR Phase I 1994 Department of Energy
  5. SAPPHIRE-METAL JOINING FOR LOW-LOSS GYROTRON WINDOWS

    SBC: Fm Technologies Inc            Topic: N/A

    A NEW TECHNIQUE, PULSED ELECTRON BEAM (PEB) JOINING, WILL BE APPLIED TO THE PROBLEM OF JOINING, LOW-LOSS CERAMIC MATERIALS USED FOR WINDOWS IN HIGH FREQUENCY MICROWAVE DEVICES TO THE METAL VACUUM ENVELOPE OF THE MICROWAVE DEVICE. THE PEB TECHNIQUE ALLOWS SELECTIVE HEATING OF THE SPECIMEN TO BE JOINED THROUGH PREFERENTIAL ENERGY DEPOSITION THAT IS CONTROLLED BY A COMBINATION OF THE ELECTRON BEAM P ...

    SBIR Phase I 1994 Department of Energy
  6. AN ELECTRON-BEAM "GATLING GUN" FOR FREQUENCY MULTIPLYING IN MICROWAVE GENERATORS

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. DEVELOPMENT OF A HIGHER PRESSURE ROTARY BLOWOUT PREVENTER FOR SAFE DIRECTIONAL DRILLING IN UNDERBALANCED APPLICATIONS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    THIS PROJECT IS AIMED AT THE DEVELOPMENT OF A NEW GENERATION OF ROTARY BLOWOUT PREVENTERS CAPABLE OF SAFE, RELIABLE, AND COST EFFECTIVE HANDLING OF THE HIGH PRESSURES EXPECTED IN UNDERBALANCED HORIZONTAL AND DIRECTIONAL DRILLING APPLICATIONS. PRESSURES OF UP TO 5,000 PSI (OR EVEN HIGHER) CAN BE EXPECTED WHEN DRILLING WITH AIR, FOAM, OR NITRIFIED MUD IN THE LOW PERMEABILITY FORMATIONS IN THE U.S. ...

    SBIR Phase I 1994 Department of Energy
  8. DEVELOPMENT OF A RADIO FREQUENCY QUADRUPOLE-FOCUSED DRIFT TUBE LINAC STRUCTURE

    SBC: Linac Systems            Topic: N/A

    A NEAR LINEAR ACCELERATOR (LINAC) STRUCTURE WILL BE IDENTIFIED AND INVESTIGATED IN PHASE I AS A POSSIBLE EXTENSION TO THE FAMILY OF STRUCTURES NOW USED FOR ACCELERATION OF CHARGED PARTICLE BEAMS. A CANDIDATE STRUCTURE HAS BEEN IDENTIFIED; OTHERS MAY BE IDENTIFIED IN THE COURSE OF THE INVESTIGATION. THE IDENTIFIED STRUCTURE UTILIZES A FOUR-FINGERED GEOMETRY TO PRODUCE RADIO FREQUENCY (RF) ELECTRI ...

    SBIR Phase I 1994 Department of Energy
  9. A MULTIMEDIA SOFTWARE TUTORIAL ON SUPER-CONDUCTING ACCELERATOR MAGNETS

    SBC: Mjb Consulting            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  10. FORECASTING RESERVOIR THICKNESS WITH FRACTALS

    SBC: Nw Resources            Topic: N/A

    THE NATION DESIRES TO EXPAND THE USE OF CLEAN BURNING, COMPETITIVELY PRICED NATURAL GAS. THE INCREASED DEMAND FOR NATURAL GAS HAS PROMPTED NEW DRILLING IN ESTABLISHED GAS FIELDS. THE PROPER PLACEMENT OF THE NEW WELLS IS DEPENDENT ON THE GAS FORMATION PROPERTIES BETWEEN THE EXISTING WELLS. ONE OF THE PROPERTIES IS THE THICKNESS OF THE GAS BEARING ZONE. IT IS GENERALLY ACCEPTED THAT THE FORMATIO ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government