You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SBIR Phase I: A Real Time Analyzer for Chlorinated Hydrocarbons
SBC: SOUTHWEST SCIENCES INC Topic: N/AN/A
SBIR Phase I 1996 National Science Foundation -
SBIR PHASE I: Asynchronous Integration of Processors and Hardware for Real-Time Simulation
SBC: Ad Inter Topic: N/AN/A
SBIR Phase I 1996 National Science Foundation -
SBIR Phase I: Chemical Sensors Based on Dendritic Polymers for Detection of Environmental Pollutants
SBC: DENDRITECH, INC Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Computerized Algal Identification System (CAIS)
SBC: Phycotech Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Dynamic, Real-Time Man-Machine Interface for Manual Welding
SBC: IMPACT Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Electrocatalysts for Direct Methanol Fuel Cells
SBC: T/J Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Erythropoientin Cell Therapy in Chronic Renal Failure
SBC: NEPHROS THERAPEUTICS, INC. Topic: N/AN/A
SBIR Phase I 1996 National Science Foundation -
SBIR Phase I: Exhaustive Oxidation of Indoor Air Contaminants via an Ozonated, Ultra-Violet Irradiated Flurocarbon/TiO2 Dispersion
SBC: Surfactant Assoc Inc. Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR Phase I: Ground Truthing Approach to Risk Assessment and Communication Under Uncertainty
SBC: Decisionfx Topic: N/AN/A
SBIR Phase I 1997 National Science Foundation -
SBIR PHASE I: Hand-Held, Spatially Unrestricted Force Feedback
SBC: CYBERNET SYSTEMS CORPORATION Topic: N/AN/A
SBIR Phase I 1996 National Science Foundation