You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Portable Supercritical Fluid Extraction System for Direct Extraction of Heavy Metals from Wastewater
SBC: Durability, Inc., Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Development of Novel Iron-Chromium-Silicon Alloys for Use in Kraft Recovery Boilers
SBC: E. R. Johnson Associates, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Environmentally Responsible Recycling of Thin-Film Cadmium Telluride Modules
SBC: First Solar, Llc Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
An Induction Modulator for a Relativistic-Klystron Two-Beam Accelerator
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Suppression of Voltage Breakdown in High-Gradient Radiofrequency Cavities
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Electrokinetically Enhanced Extraction of Radionuclides, Heavy Metals, and Organics from Soil Using Surfactant Micelles
SBC: ISOTRON CORPORATION Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
A Novel Tritium Collection Technology Using Fullerence Tritides
SBC: ATS-MER, LLC Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Nanostructured Interstitial Alloys as Catalysts for Direct Energy Applications
SBC: Nanomaterials Research LLC Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
Nanostructured Thermal Barrier Coatings for Natural Gas-Fired Advanced Turbines
SBC: Nanomaterials Research LLC Topic: N/AN/A
SBIR Phase I 1995 Department of Energy -
A Large-Area Air Mass 1.5 Non-Pulsed Solar Simulator for Testing Photovoltaic Modules: An Experimental Design
SBC: Sc-international Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Energy