You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE BULK-STORAGE MODULE FOR FASTBUS MEMORY APPLICATIONS

    SBC: SCIENTIFIC SYSTEMS CO INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  2. CONVERSION OF METHANE TO METHANOL AND GASOLINE

    SBC: Starchem            Topic: N/A

    THE TARGET OF THE PROPOSED PROCESS IS TO CONVERT NATURAL GASFROM SMALLER OR LARGER NATURAL GAS SOURCES (INCLUDING SMALL OUTLYING GAS WELLS OR CO-PRODUCED GAS OUT OF A CRUDE OIL PRODUCING WELL) INTO CRUDE METHANOL AND HYDROCARBONS, AND CENTRALLY CONVERT THESE CRUDE LIQUIDS FURTHER INTO COMPONENTS FOR GASOLINE USE. A LOW-COST PROCESS FOR THESE CONVERSIONS HAS BEEN INVENTED BY DR. VAN DIJK AND MR. FR ...

    SBIR Phase I 1990 Department of Energy
  3. RECOVERY OF ORGANIC VAPORS FROM PRINTING AND PAINTING OPERATIONS USING SURFACTANT-ENHANCED CARBON REGENERATION

    SBC: Surfactant Assoc Inc.            Topic: N/A

    ACTIVATED CARBON IS FREQUENTLY USED TO ABSORB ORGANIC MATERIALS FROM AIR AND WATER IN MANY INDUSTRIAL OPERATIONS. IN PARTICULAR, ACTIVATED CARBON IS USED TO ABSORB VOLATILE ORGANICS FROM THE EXHAUST AIR IN THE PRINTING AND PAINTING INDUSTRIES. A NECESSARY PART OF SUCH OPERATIONS IS THE REGENERATION OF THE ACTIVATED CARBON WITH SIMULTANEOUS RECOVERY OF THE ORGANIC MATERIAL, WHICH IS GENERALLY VERY ...

    SBIR Phase I 1987 Department of Energy
  4. AN ULTRA FAST SCINTILLATOR FOR WELL LOGGING APPLICATIONS

    SBC: TPL, INC            Topic: N/A

    BECAUSE OF THEIR LONG DECAY TIMES, SCINTILLATORS IN NEUTRON LOGGING TOOLS ARE RESPONSIVE PRIMARILY TO THE GAMMA RADIATION FROM THE NEUTRON CAPTURE SPECTUM. THIS INHIBITS POROSITY MEASUREMENTS IN GAS-FILLED ZONES AND SUBSTANTIALLY LIMITS THE ELEMENTAL INFORMATION ON THE STRATA WHICH CAN BE ACQUIRED. ADVANCES IN NEUTRON LOGGING TOOLS REQUIRE A NEW SCINTILLATOR MATERIAL CAPABLE OF MAKING PRECISION ME ...

    SBIR Phase I 1990 Department of Energy
  5. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. DEPRESSED COLLECTORS FOR MEGAWATT GYROTRONS

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    A PROGRAM IS PROPOSED TO SHOW THE FEASIBILITY OF DEPRESSED COLLECTORS FOR VERY HIGH AVERAGE POWER (APPROX. 1MW) GYROTRON OSCILLATORS FOR FUSION APPLICATIONS. INITIAL CALCULATIONS INDICATE THAT COLLECTION EFFICIENCIES EXCEEDING 75% CAN BE REALIZED. USE OF SUCH A COLECTOR ON A GYROTRON WITH A BASE EFFICIENCY OF 30% WOULD INCREASE THE EFFICIENCY TO OVER 60%. SUCH A DRAMATIC INCREASE IN EFFICIENCY WOU ...

    SBIR Phase I 1990 Department of Energy
  7. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  9. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  10. A GEOSTATISTICAL ANALYSIS OF CROSSBOREHOLE SEISMIC DATA FOR RESERVOIR CHARACTERIZATION

    SBC: Justice Associates Inc.            Topic: N/A

    IMPROVED MANAGEMENT OF HYDROCARBON RESERVOIRS MAY BE THE MOST IMPORTANT KEY TO MAINTAINING OR EXPANDING THE PETROLEUM/NATURAL GAS PRODUCTION CAPABILITY OF THE U.S. IN THE WORLD MARKET. NEW INTERWELL SEISMIC IMAGING OF THE DISTRIBUTION OF RESERVOIR DESCRIPTION, SIMULATION, AND MANAGEMENT. THIS TECHNOLOGY OFFERS ONE OF THE FEW MEANS AVIALABLE TODAY FOR EVALUATING THE STATE OF THE RESERVOIR BETWEEN S ...

    SBIR Phase I 1993 Department of Energy
US Flag An Official Website of the United States Government