You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PARALLEL 3-D MAGNETIC RESONANT ADDRESS MEMORY
SBC: Mram Inc Topic: N/APARALLEL PROCESSOR SYSTEMS ARE ACCLAIMED FOR SUPERCOMPUTING. ALL PARALLEL SYSTEMS REQUIRE TRUE PARALLEL ACCESS MEMORIES (NO INTERLEAVING) FOR EFFICIENT PARALLELISM. MRAM HAS INVENTED THE FIRST TRUE PARALLEL MEMORY. AS A RESULT OF THIS BREAKTHROUGH IN COST/PERFORMANCE, PARALLEL SYSTEMS CAN NOW SPAN THE FULL MARKET RANGE, FROM LARGE SUPERCOMPUTERS TO PCS. THIS PARALLEL RAM USES ELECTROMAGNETIC RF WA ...
SBIR Phase I 1991 Department of DefenseMissile Defense Agency -
ECM RESISTANT GLOBAL POSITIONING SYSTEM (GPS) RECEIVER
SBC: THE NAVSYS CORPORATION Topic: N/AGPS IS PLANNED TO BE USED BY THE U.S. ARMY IN A VARIETY OF TACTICAL SCENARIOS. FIRE CONTROL APPLICATIONS ARE CURRENTLY BEING INVESTIGATED WHERE GPS WOULD BE USED TO TRACK REGISTRATION ROUNDS AND LOCATE RADIOSONDES. SINCE GPS IS A RADIONAVIGATION SYSTEM, ITS EFFECTIVENESS IN A TACTICAL ENVIRONMENT IS LIMITED BY ITS SUSCEPTIBILITY TO ELECTRONIC COUNTERMEASURES (ECM). IT IS PARTICULARLY DIFFICULT TO ...
SBIR Phase I 1991 Department of DefenseArmy -
ADVANCED SIGNAL PROCESSING METHODS FOR SMART MUNITIONS SEEKERS
SBC: ONTAR CORP. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
A PORTABLE FM-CW DOPPLER RADAR TO PROVIDE METEOROLOGICAL DATA IN THE FIELD
SBC: Ophir Corporation Topic: N/AA PORTABLE, LOW COST FM-CW DOPPLER WEATHER RADAR IS PROPOSED TO PROVIDE "REAL-TIME" METEOROLOGICAL DATA IN THE FIELD. SUCH A SYSTEM WOULD ASSIST BATTLEFIELD DECISION MAKING BY MONITORING CONDITIONS PERTINENT TO MICROWAVE DUCTING, ARTILLERY CONTROL, AND DETERMINING LOCAL WEATHER. CURRENT DOPPLER WEATHER RADARS TEND TO BE PULSED, VERY LARGE, AND TO COST MILLIONS OF DOLLARS; THEY REQUIRE A LARGE OPER ...
SBIR Phase I 1991 Department of DefenseArmy -
KEROSENE BASE FUELS IN SMALL GASOLINE ENGINES
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
EMBEDDED FIBER OPTIC SENSOR FOR COMPOSITE FLEXBEAMS
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
OPTICAL COMPUTER FOR FRACTAL IMAGE ANALYSIS
SBC: FOSTER-MILLER, INC. Topic: N/AN/A
SBIR Phase II 1991 Department of DefenseMissile Defense Agency -
A LASER TO MEASURE FRAGMENT VELOCITY AND MASS
SBC: PHYSICAL SCIENCES INC. Topic: N/AWE ARE PROPOSING TO DEVELOP A LASER DIAGNOSTIC TOOL WHICH WILL MEASURE THE INITIAL (PEAK) VELOCITIES AND VOLUMES OF WARHEAD FRAGMENTS SIMULTANEOUSLY. THIS WILL BE ACCOMPLISHED BY TAKING TIME-SEQUENCED LASER SHADOW PHOTOGRAPHS OF THE WARHEAD SIMULTANEOUSLY ALONG THREE ORTHOGONAL AXIS SHORTLY AFTER DETONATION AND CALCULATING FRAGMENT VELOCITY AND VOLUME FROM THE CORRELATED IMAGES. THIS CAN BE ACCOMP ...
SBIR Phase I 1991 Department of DefenseArmy -
COMPACT FAST RESPONSE TRANSDUCER FOR DIRECT HEAT FLUX MEASUREMENT
SBC: PHYSICAL SCIENCES INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy -
AEROBALLISTIC DATA ACQUISITION SYSTEM (ADACS)
SBC: Q-DOT, INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseArmy