You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343
SBC: Kaney Aerospace, Inc. Topic: DLA231001Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Production, Testing, and Production Analysis of 3D Printed Carbon/Carbon Frusta
SBC: MANTIS COMPOSITES INC Topic: DLA222007The current Carbon/Carbon (C/C) industrial base is woefully incapable of supporting demand from the adoption of hypersonic systems. These limitations present themselves in three key areas: The production of legacy C/C components is fundamentally incompatible with achieving high production volumes, with intense human involvement and long production timelines. Reliance on intricate human-centric pro ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
ICME-informed DED Additive manufacturing for NSN 4820-00-483-0679
SBC: MRL MATERIALS RESOURCES LLC Topic: DLA222001Shortage of spare parts for our U.S. Navy assets can be costly as shown last year when the U.S. Navy to resort to a partial “spare parts cannibalism” for the newest carrier USS Gerald R. Ford that worth $13 billion. Through our communication with the Navy customer (NSWC Philadelphia ISEAs ) during phase I of the project, we became aware of another issue which threaten our current Navy assets. ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Increased Production Capacity of Cf/ZrC CMCs for Hypersonic and Related Applications, Phase II
SBC: ULTRAMET Topic: DLA222007Hypersonic weapon flight performance is improved significantly by the drag reduction achieved when thermal protection system (TPS)-related structures remain sharp and shape-stable under all flight conditions. Ultramet’s approach to this design goal is to utilize its carbon fiber-reinforced zirconium carbide (Cf/ZrC) ceramic matrix composite (CMC) material for these applications. Ultramet has dev ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
Production of Pure Magnesium with Green technology from ore Materials-Dolomite and Magnesite
SBC: CROWN MAGNESIUM INC Topic: DLA232003Magnesium metal, sometimes referred to as the “Green Metal” is important for defense and industrial use, as it is the lightest of all the structural and engineering metals. Magnesium also has superior mechanical properties such as high dampening capacity, heat dissipation, and shock absorbing capacity. Magnesium is 100% recyclable. Due to these factors, magnesium metal is in high demand in the ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
CYRIN-OT: Advanced Cyber Range for Operational Technology Digital Twins
SBC: ATC-NY INC Topic: DLA232004Industrial control system (ICS) operational technology (OT) systems enable increased process efficiency and cost savings. At the same time, they allow for increasingly complex cyber-attacks with devastating physical impacts. The ATC-NY team will design and build CYRIN-OT, a system for creating virtual “digital twins” of OT networks and performing security assessments on them. Any diverge ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains
SBC: COMPASS SYSTEMS, INC. Topic: DLA231001Compass Systems Inc. has extensive design and manufacturing expertise in the Cable Harness industry. Our team of engineers and manufacturing technicians are well suited to support the technical review of fragmented/incomplete documentation, system inspection (if required), TDP generation, and the SAR submission for NSN 615013643908. Compass Systems Inc. also possess extensive past performance ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Parts Life, Inc. 20.2 Phase II Proposal
SBC: PARTS LIFE INC Topic: DLA202001For this Phase II, Parts Life, Inc. is proposing to improve product availability and increase competition through the development of Source Approval Requests (SAR) for NSNs 5330-00-992-1516 Seal Ring Metal, 5330-00-798-2704 Seal Ring Metal, 5330-00-796-9180 Gasket, 5331-01-010-2929 O-Ring, 5331-00-425-9124 O-Ring, 5331-00-618-3447 O-Ring, 4820-01-202-6339 Seat, Valve, 5310-00-164-1100 Wash ...
SBIR Phase II 2023 Department of DefenseDefense Logistics Agency -
PLI Response to DLA232-001 NSN 5935-00-459-9640
SBC: PARTS LIFE INC Topic: DLA232001Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5935-00-459-9640, Connector, Receptacle, Electrical. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by a ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency