You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: HIGH PERFORMANCE MATERIALS GROUP, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseSpecial Operations Command
  2. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. Advanced Combat Rubber Raiding Craft (Small)

    SBC: Maravia Corp            Topic: N/A

    The Combat Rubber Raiding Craft (Small) (CRRC(S)) is used by Special Operations Forces (SOF). The current craft, underway, produces a highly discernible bow wave that enhances its probability of detection. A primary means of reducing the detect- ability of the CRRC(S) is to decrease the bow wave and wake of the craft that will enhance the survivability of the craft and crew in the combat arena. To ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. Miniature RF Receiving Antenna

    SBC: Scientech, Inc.            Topic: N/A

    SCIENTECH proposes to design, develop, and test an ultra-broadband active biconical antenna, fabricated from thin copper clad fiber glass or teflon (PCB). This active biconical antenna will be designed and be compatible with existing receivers, will be extremely low physical profile, and yet support effective reception in the HF, VHF, and UHF frequency ranges. The ultra-broadband active biconical ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  5. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    CSA PROPOSES TO DESIGN AND IMPLEMENT A STEADY-STATE SOLUTION FOR THE COMPLETE SYSTEM OF EQUATIONS SOLVED IN EITHER THE TRAC/PF1, TRAC/BD1, OF RELAP5 CODES. THE STEADY-STATE SOLUTION WILL UTILIZE THE STEADY-STATE FORM OF THE MODEL EQUATIONS AND WILL UTILIZE EXISTING EQUATION SOLVERS TO THE EXTENT POSSIBLE. ALL TIME-DEPENDENT CONSTITUTIVE AND COMPONENT MODELS WILL BE INCLUDED IN THE SOLUTION TO ENSU ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  7. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government