You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TacDIVE- A Diver Health and Safety Monitoring and Alerting System
SBC: HUMAN SYSTEMS INTEGRATION INC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Diver Performance Monitoring System (DPMS)
SBC: CORNERSTONE RESEARCH GROUP INC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
OxyBeacon Diver Health Monitoring System
SBC: CRITICAL INNOVATIONS LLC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Diver Performance Monitoring System
SBC: LUNA LABS USA LLC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
PRISM: Physiological Ruggedized Integrated Sensor-based Monitoring
SBC: APTIMA INC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
In-ear Diver Monitoring System
SBC: ASYMMETRIC TECHNOLOGIES, LLC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
HYDROS- Hybrid Diver Readiness Observation System
SBC: ALTEC, INC Topic: A234004Redacted
SBIR Phase I 2023 Department of DefenseArmy -
Holistic Health and Fitness Readiness Kit
SBC: BURCHELL PROFESSIONAL GROUP, INC Topic: A234005During phase 1 research an innovative, low cost, low maintenance, high strength, semi-portable infrastructure (building and foundation) for a Holistic Health and Fitness (H2F) Soldier Performance Fitness Center (SPFC) will be designed and developed in close cooperation with the Army's Technical Point of Contacts (TPOCs) during a 3 month Period of Performance (PoP). Burchell Professional Group Inc. ...
SBIR Phase I 2023 Department of DefenseArmy -
BeaverFit
SBC: BEAVERFIT NORTH AMERICA LLC Topic: A234005Proposed Approach: BeaverFit seeks to satisfy the requirements of this proposal and subsequent SBIR phases through four main technical objectives (TO). Metrics of success will be applied to each TO to validate the effectiveness of the project and track progress toward accomplishment of the desired end state. Key measures of performance identified within the TO include cost, timelines, and throughp ...
SBIR Phase I 2023 Department of DefenseArmy -
A234-005- Holistic Health and Fitness Readiness Kit ABS Proposal
SBC: ASSISTED BUILDING SOLUTIONS LLC Topic: A234005ABS, partnered with SMM is pleased to present design solutions for the Army's Holistic Health and Fitness Readiness Kit requirement. The objective of our solutions is to ensure critical innovative technique, cost and time efficiency, mobility, provide a 25–50-year life cycle, and encompass the NFAP 285, and the New ASCE 7-22 codes design standards. Our building solutions meet the energy, heigh ...
SBIR Phase I 2023 Department of DefenseArmy