You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Development of Thermodynamic Capability for Integrated Computational Materials Engineering

    SBC: Computherm, LLC            Topic: AF15AT30

    ABSTRACT: CompuTherm, LLC proposes a pilot project to develop an innovative modeling tool for rapid deployment of thermodynamic capability for Integrated Computational Materials Engineering (ICME). To be developed on the basis of CompuTherms current capability, Pandat software, the proposed modeling tool represents the next generation of CALPHAD software. The significant advances of the proposed m ...

    STTR Phase I 2015 Department of DefenseAir Force
  2. Secure Software Components Leveraging the seL4 Microkernel

    SBC: TECHSHOT, INC.            Topic: SB151003

    Techshot proposes the L4 ArchitectUre for Next-generation Crewed Hardware (LAUNCH), a set of open-source software components that leverages the verified separation kernel of seL4 to create a robust achievable system that can be used to reduce the cost and development time of highly reliable systems like those used on crewed space flight. With over a 25 year history of developing life science paylo ...

    SBIR Phase I 2015 Department of DefenseDefense Advanced Research Projects Agency
  3. Innovative Sensor Tasking Capabilities

    SBC: BLACK RIVER SYSTEMS COMPANY, INC.            Topic: MDA13007

    Our objective is to develop and demonstrate an integrated capability to perform dynamic retasking of missile defense surveillance sensors. The goal of this effort is to develop an task scheduling algorithm that will allow the the earliest possible event detection and maintain the highest quality tracks throughout the entire engagement. Each sensor will have a unique motion history and possibly d ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  4. High Frame Rate and Dual Band Infrared Focal Plane Array (FPA) Sensors

    SBC: NBN TECHNOLOGIES, LLC            Topic: MDA13028

    nBn Technologies proposes using our new absorber materials for dual color long wave infrared (LWIR) nBn FPAs. Our optimized nBn structure and devices show state of the art performance in the long wave infrared regime with greater quantum efficiency in top and bottom illumination due to to low dark current. Our main goal in this phase-II is to develop and demonstrate dual color nBn FPAs utilizing ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  5. Radar Tracking in Stressing Environments

    SBC: HELIOS REMOTE SENSING SYSTEMS, INC.            Topic: MDA13001

    Helios Remote Sensing Systems, Inc. proposes to develop and estimate the performance of innovative improvements to radar systems that will help defeat advanced countermeasures. Novel signal processing techniques for detecting and filtering objects will provide for improved radar tracking in dense raid environments. The proposed techniques will allow for rapid filtering of debris and advanced cou ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  6. Critical High Energy Laser (HEL) Technologies- Power Sources

    SBC: MOHAWK INNOVATIVE TECHNOLOGY, INC.            Topic: MDA13021

    The objective of the Phase II proposed effort is to design and demonstrate the ability to develop a high-speed composite flywheel-based Electromechanical Battery (EMB), to support deployment of high energy laser (HEL) technology for missile defense. The Phase I design studies assessed the EMB size, operating speeds and material requirements needed to achieve the energy density levels and charge/d ...

    SBIR Phase II 2015 Department of DefenseMissile Defense Agency
  7. Parking-Cruising Caused Congestion & Targeting Public Mitigation Investments

    SBC: NELSON/NYGAARD CONSULTING ASSOCIATES, INC.            Topic: 142FH2

    Cruising for parking is a problem that cities have long struggled to address. Recent efforts by the FHWA in San Francisco, Minneapolis, Los Angeles, and other cities have advanced the state of knowledge but large gaps remain. This project seeks to address these important gaps by using GPS traces, GPS-augmented travel surveys, and GPS traces with driver video to quantify the extent of cruising, and ...

    SBIR Phase I 2015 Department of Transportation
  8. A Tool for Building Semantically Interoperable Specification and Standards

    SBC: XSB INC            Topic: 9010273R

    Standards and specifications are widely used in government and industry to define requirements for products and processes and insure interoperability, safety, and quality of industrial and domestic products. Specifications and standards documents almost always cross-reference other standards and specification. Taken together, the web of interdependent standards forms an immensely important knowled ...

    SBIR Phase I 2015 Department of CommerceNational Institute of Standards and Technology
  9. Teachley Analytics Library: A Collection of Educational Apps Personalizing Gameplay and Reporting Insights

    SBC: TEACHLEY, LLC            Topic: EDIES15R0005

    This project team is developing and testing a prototype of the Teachley Analytics Library, a platform intended to host third party-developed mathematics game apps for students in kindergarten through Grade 8. The prototype will include a dashboard to host games and generate formative assessment data to inform teacher instruction. In the Phase I pilot study, the team will examine whether the protot ...

    SBIR Phase I 2015 Department of EducationInstitute of Education Sciences
  10. High Performance Iterative Tomography Reconstructions on GPU and Intel Xeon Phi Coprocessor

    SBC: Peri, LLC            Topic: 02a

    Tomographic reconstructions with insufficient data, such as the projections scanned with inadequate angular range or contaminated with noise, are often confronted for transmission electron microscopy and full-field transmission X-ray microscopy. Iterative reconstructions can provide a viable solution by numerical optimization with a cost of intensive computational overhead. Al ...

    STTR Phase I 2015 Department of Energy
US Flag An Official Website of the United States Government