You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SWEET SORGHUM FOR A PIEDMONT ETHANOL INDUSTRY

    SBC: Applied Science Associates. In            Topic: N/A

    APPLIED SCIENCE ASSOCIATES, INC. PROPOSES TO PRODUCT FUEL ALCOHOL FROM SWEET SORGHUM: A PROLIFIC PRODUCER OF BIOMASS ON MARGINAL FARMLAND, RENEWABLE AND NON-COMPETITIVE WITH THEFOOD CHAIN. AN EXPERIMENTAL PROTOTYPE OF A "CROSSFOADS" FEEDSTOCK PROCESSOR IS AT HAND; A LOADER, A FLAIL FOR SEPERATINGPITH FROM RIND, A VIBRATING SEPARATOR OF THESE COMPONENTS, AAND A SCREW PRESS FOR EXPRESSING THE JUICE. ...

    SBIR Phase II 1987 Department of Agriculture
  2. LOW-COST CERAMIC MEMBRANES FOR FOOD PROCESSING

    SBC: Ceramem Corporation            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Agriculture
  3. A FLOW-SHAPING SLUICE GATE FOR MEASURING AND CONTROLLING WATER FLOW

    SBC: Deerfield Controls            Topic: N/A

    IN THE UNITED STATES, AGRICULTURE ACCOUNTS FOR OVER 80 PERCENT OF THE TOTAL ANNUAL WATER CONSUMPTION. GROWING METROPOLITAN AREAS ARE PLACING NEW DEMANDS ON EXISTING WATERRESOURCES, REQUIRING THAT AGRICULTURAL IRRIGATION SYSTEMS BEAS EFFICIENT AS POSSIBLE. TO HELP OPTIMIZE THE FLOW DELIVERY OF IRRIGATION SYSTEMS, A COST-EFFECTIVE, ACCURATE FLOW-MEASURING SLUICE GATE FOR CANALSIDE TURNOUT METERING A ...

    SBIR Phase I 1987 Department of Agriculture
  4. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. DETECTION OF ERYTHROMYCIN IN ANIMAL-DERIVED PRODUCTS

    SBC: Hybrivet Systems Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Agriculture
  6. PREDICTIONS OF ROCK ANCHOR CAPACITIES BY UP-HOLE SEISMIC VELOCITY TECHNIQUES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    A METHOD OF ESTABLISHING THE HOLDING CAPACITY OF ROCK ANCHORS IS PROPOSED. THE TECHNIQUE INVOLVES IMPROVED ELECTRONICS TO ESTABLISH UP-HOLD SEISMIC PROFILES. THESE VELOCITIES WOULD PROVIDE A QUANTIFIABLE METHOD OF DESIGNING ANCHORAGES IN COMPLEX STRATIGRAPHIES AND FRACTURED CONDITIONS SUCH AS COMMONLY FOUND IN CABLE LOGGING OPERATIONS. THE SYSTEM, OPERABLE BY A LAY LOGGER, WOULD ALLOW UTILIZATION ...

    SBIR Phase II 1987 Department of Agriculture
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government