You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...

    SBIR Phase I 1994 Department of Energy
  2. AN INTELLIGENT TUTORING GAME TO TEACH SCIENTIFIC REASONING

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  3. HIGH QUALITY CHEMICALLY VAPOR DEPOSITED NIOBIUM COATINGS FOR SUPERCONDUCTING RADIO FREQUENCY CAVITIES

    SBC: Sumi Tech, Inc.            Topic: N/A

    TRADITIONALLY, SUPE2RCONDUCTING CAVITIES FOR LARGE ELECTRON POSITION COLLIDERS ARE FABRICATED FROM HIGH PURITY NIOBIUM (NB) SHEETS USING LATHE SPINNING AND WELDING. THESE CAVITIES SUFFER FROM THE PROBLEM OF THERMOMAGNETIC BREAKDOWN RESULTING FROM THE RELATIVELY POOR THERMAL CONDUCTIVITY OF NB AT LIQUID HELIUM TEMPERATURES. A MORE ELEGANT AND LOW COST SOLUTION TO THE BREAKDOWN PROBLEMS IS THE USE ...

    SBIR Phase I 1994 Department of Energy
  4. DEVELOPMENT OF METAL HYDRIDE MATERIALS FOR HIGH COEFFICIENT OF PERFORMANCE HEAT PUMPS

    SBC: Thermal Electric Devices Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  5. HEAVY METAL REMEDIATION OF SOIL USING PERMEABLE CHELATION BARRIERS

    SBC: TPL, INC            Topic: N/A

    REMEDIATION OF SOIL AND GROUNDWATER TO REDUCE HEAVY METAL CONTAMINANTS TO BACKGROUND LEVELS POSES A SERIOUS CHALLENGE. CONVENTIONAL METHODS ARE ABLE TO REDUCE CONTAMINATION LEVELS, BUT TOTAL REMEDIATION, DEFINED AS ACHIEVEMENT OF BACKGROUND LEVELS OF THE METAL, MAY NOT BE ECONOMICALLY FEASIBLE. A PERMEABLE CHELATION BARRIER CONTAINING SILICA GEL MODIFIED TO CHELATE HEAVY METALS PROVIDES AN ECONO ...

    SBIR Phase I 1994 Department of Energy
  6. A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS

    SBC: Vista Control Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  7. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS

    SBC: Whistlesoft Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government