You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COHESIONLESS SOIL AND SMALL DISCONTINUOUS REINFORCING ELEMENTS IN COMPOSITE ENGINEERING MATERIALS

    SBC: Earthwater Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  2. "RELIEF OF ENERGY TRANSFER LIMITATIONS IN ELECTRICAL POWER SYSTEMS"

    SBC: Ecc Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  3. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  4. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. ADA QUALITY TOOLSET

    SBC: Software Design & Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  6. AN INNOVATIVE USE OF PULSED POWER TECHNOLOGY FOR SEPARATING MINERALS FROM ORES

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  7. THERMAL CONDUCTIVITY, DIFFUSIVITY PROBE DEVELOPMENT

    SBC: Vatell Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  8. LASER ANNEALING OF PLASMA PROCESSED HIGH TC SUPERCONDUCTING MATERIALS AND DEVICES

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1988 National Science Foundation
  9. NEW METHOD OF OXIDATION- REDUCTION OF HAZARDOUS ORGANICS

    SBC: American Combustion Inc            Topic: N/A

    AN EVALUATION OF THE FEASIBILITY OF A NEW METHOD OF OXIDATION - REDUCTION OF HAZARDOUS ORGANICS BY THE USE OF A SACRIFICIAL METAL IN A SPONTANEOUS PROCESS TRIGGERED BY CEMENTATION OF A NOBLE METHOD WILL BE PREFORMED. EFFECTS ASSOCIATED WITH MAJOR PROCESS PARAMETERS SUCH AS PH,MIXING, ATMOSPHERE, ETC. ON THE EFFICIENCY AND RATES OF OXIDATION - REDUCTION OF VARIOUS CLASSES OF HAZARDOUS ORGANICS WILL ...

    SBIR Phase I 1988 National Science Foundation
  10. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government