You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
INTELLIGENT LOAD CONTROL USING AN EXPERT SYSTEM
SBC: Micon Engineering Topic: N/ATHE PURPOSE OF THIS PROJECT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING AN INTELLIGENT CUSTOMER LOAD CONTROLLER IMPLEMENTED WITH AN EXPERT SYSTEM. CONVENTIONAL ELECTRICAL LOAD CONTROL DEVICES IMPLEMENT CONTROLLING FUNCTIONS BASED ON PREDETERMINED ALGORITHMS WHICH MAKE ASSUMPTIONS ABOUT TYPICAL USE PATTERNS. USE OF AN EXPERT SYSTEM WITH A LEARNING ALGORITHM IN A LOAD CONTROLLER WOULD PERMIT THE C ...
SBIR Phase I 1990 Department of Energy -
SURVEY OF TRANSIT-TIME AMPLIFIERS FOR APPLICATIONS TO HIGH ENERGY PHYSICS ACCELERATORS
SBC: MISSION RESEARCH CORP. Topic: N/AHIGH POWER TRANSIT-TIME AMPLIFIERS ARE A NEW CLASS OF RF SOURCE THAT CONVERTS THE KINETIC ENERGY OF AN ELECTRON BEAM INTO RF RADIATION IN A VERY EFFICIENT WAY. WHEN THE BEAM CROSSES THE CAVITY OF PROPER DIMENSIONS, IT WILL INTERACT WITH A SINGLE CAVITY MODE THEREBY RADIATING COHERENTLY AT THE MODE'S FREQUENCY. MODE GROWTH CONTINUES UNABATED UNTIL THE RF FIELDS ARE LARGE ENOUGH TO MODIFY THE BEAM O ...
SBIR Phase I 1990 Department of Energy -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
AN INVESTIGATION AND DEVELOPMENT OF THE COLLECTIVE INTERACTION KLYSTRON
SBC: MISSION RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1987 Department of Energy -
A MULTIMEDIA SOFTWARE TUTORIAL ON SUPER-CONDUCTING ACCELERATOR MAGNETS
SBC: Mjb Consulting Topic: N/AN/A
SBIR Phase I 1994 Department of Energy -
A NEW ELECTROSTATIC ACCELERATOR FOR POSITRON EMISSION TOMOGRAPHY
SBC: North Star Research Corp. Topic: N/ATHE OBJECTIVE OF OUR PROJECT IS TO DEVELOP NEW MEANS OF PRODUCING SHORT LIVED RADIOISOTOPES FOR POSITRON EMISSION TOMOGRAPHY (PET). THIS MEDICAL DIAGNOSTIC TECHNIQUE IS CAPABLE OF DISCERNING AND IMAGING MEDICALLY INTERESTING PHENOMENA, SUCH AS THE ACTIVITY OF VARIOUS PARTS OF THE BRAIN, OXYGEN FLOW IN THE BODY, AND OTHER QUANTITIES WHICH ARE IMPOSSIBLE TO DETERMINE BY ANY OTHER DIAGNOSTIC TECHNIQU ...
SBIR Phase I 1990 Department of Energy -
FORECASTING RESERVOIR THICKNESS WITH FRACTALS
SBC: Nw Resources Topic: N/ATHE NATION DESIRES TO EXPAND THE USE OF CLEAN BURNING, COMPETITIVELY PRICED NATURAL GAS. THE INCREASED DEMAND FOR NATURAL GAS HAS PROMPTED NEW DRILLING IN ESTABLISHED GAS FIELDS. THE PROPER PLACEMENT OF THE NEW WELLS IS DEPENDENT ON THE GAS FORMATION PROPERTIES BETWEEN THE EXISTING WELLS. ONE OF THE PROPERTIES IS THE THICKNESS OF THE GAS BEARING ZONE. IT IS GENERALLY ACCEPTED THAT THE FORMATIO ...
SBIR Phase I 1994 Department of Energy -
Alternative Metal Forming Using Laser Engineered Net Shaping
SBC: OPTOMEC, INC. Topic: N/A50 Alternative Metal Forming Using Laser Engineered Net Shaping--Optomec Design Company, 13170 B Central Avenue SE, Suite 310, Albuquerque, NM 87123-3032; (505) 343-9139 Mr. David M. Keicher, Principal Investigator Mr. Thomas A. Swann, Business Official DOE Grant No. DE-FG03-97ER82448 Amount: $74,777 Energy intensive metal forming operations are among the most common steps in manufacturing ...
SBIR Phase I 1997 Department of Energy -
Oxidation Induction Time Technology for Electric Cable Condition Monitoring and Life-Assessment
SBC: Pacific-sierra Research Corp. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE
SBC: PLANNING SYSTEMS, INC. Topic: N/ATHIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...
SBIR Phase I 1994 Department of Energy