You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  2. Solid-State Ultracapacitors for Electric Vehicles and Consumer Electronics

    SBC: Cape Cod Research            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. A 300V Electromechanical Capacitor: Research and Development Thererof

    SBC: COVALENT ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  4. A High Power Battery Based on Insertion Electrodes

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    40297 November 6, 1996 EIC Laboratories, Inc. Widespread use of electric vehicles will depend on rechargeable batteries with high power and energy and long cycle life. This project will develop a high power rechargeable battery composed of Li insertion electrodes and a polymer electrolyte with a room temperature conductivity of ~3.5 x 10-3 S/cm. Its pow ...

    SBIR Phase I 1996 Department of Energy
  5. Carbon Monoxide Tolerant Anodes for Proton Exchange Membrane (PEM) Fuel Cells

    SBC: EIC LABORATORIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  6. An Innovative Hybrid Process for the Economical Upgrading of Raw Natural Gas to Pipeline Quality

    SBC: Endesco Services, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. Synergetic Ultracapacitor

    SBC: Federal-Fabrics-Fibers, Inc.            Topic: N/A

    40915 November 18, 1996 Federal Fabrics-Fibers, Inc. Ultracapacitors, when combined with batteries, can yield high performance electrical energy storage systems for electric vehicles. While batteries handle the relatively low average power demand, the ultracapacitors would handle short power peaks during acceleration, braking, and hill climbing. This pr ...

    SBIR Phase I 1996 Department of Energy
  8. Pulsed Induction Joining of Sapphire to Metal for Gyrotron Windows

    SBC: Fm Technologies Inc            Topic: N/A

    41291 November 19, 1996 FM Technologies, Inc. The window is currently the single most serious mode of failure of high power gyrotrons, a device for heating magnetic fusion plasmas. This project will develop a new technique for joining ceramic materials, used for these windows, to the metals that hold the windows in place. A pulsed induction coil system w ...

    SBIR Phase I 1996 Department of Energy
  9. Bending System for Recirculating Accelerators with Space-Charged Dominated Beams

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government