You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. ADVANCED FACILITIES TO EXPEDITE DESIGN AND EVALUATION OF PACKET SWITCHED SYSTEMS

    SBC: PREDICTION SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  2. LOW LOSS MILLIMETER-WAVE SEMICONDUCTOR WAFER PROBES

    SBC: Cascade Microtech, Inc.            Topic: N/A

    MAKING ACCURATE AUTOMATED ON-WAFER MEASUREMENTS OF MILLIMETER-WAVE SEMICONDUCTOR DEVICES AND CIRCUIT ELEMENTS IS A FUNDAMENTAL REQUIREMENT FOR THE ADVANCEMENT OF A MILLIMETER-WAVE TECHNOLOGY. MILLIMETER-WAVE WAFER PROBE DEVELOPMENT IS REQUIRED. PRESENTLY ON-WAFER PROBING IS AVAILABLE ONLY TO 26.5 GHZ. HOWEVER, SIGNIFICANT INNOVATIONS ARE REQUIRED TO EXTEND THIS CAPABILITY OF HIGHER FREQUENCIES. TH ...

    SBIR Phase I 1987 Department of DefenseArmy
  3. PROTECTIE COATINGS FOR ALUMINUM ALLOYS IN A BALLISTIC PROJECTION ENVIRONMENT

    SBC: Princeton Biomeditech            Topic: N/A

    ENHANCED GUN TUBES AND PROPELLANT TECHNOLOGY HAVE GREATLY INCREASED PROJECTILE VELOCITIES, DYNAMIC FORCES, AND AERODYNAMIC HEATING OF TANK-LAUNCHED PROJECTILES. IN MANY INSTANCES THE STRENGTH AND TEMPERATURE LIMIATIONS OF ALUMINUM ALLOY FINS HAVE BEEN EXCEEDED UNDER TANK GUN IN-BORE PROJECTION AND IN-FLIGHT CONDITIONS AND HAVE RESULTED IN DEGRADED OR COMPROMISED WEAPON SYSTEM PERFORMANCE. NEW EROS ...

    SBIR Phase I 1987 Department of DefenseArmy
  4. INTEGRATED LIGHTWEIGHT COMBAT BOOT

    SBC: Ro-search Inc            Topic: N/A

    A LIGHTWEIGHT COMBAT BOOT, SIMILAR IN UPPER PATTERN TO THE PRESENT HOT WEATHER BOOT, SUITABLE FOR ALL SEASON WEAR IN TEMPERATE CLIMATES, WITH IMPROVED BALLISTICS AND FIRE RESISTANCE, AND AN APPRECIABLE DEGREE OF CHEMICAL AND ENVIRONMENTAL THREAT RESISTANCE.

    SBIR Phase I 1987 Department of DefenseArmy
  5. HIGH EFFICIENCY MONOLITHIC GUNN OSCILLATORS

    SBC: Gain Electronics Corp            Topic: N/A

    MOST GUNN DIODE OSCILLATOR APPLICATIONS CURRENTLY EMPLOY A DISCRETE GUNN DIODE EMBEDDED INTO EITHER A HYBRID OR A WAVEGUIDE MATCHING CIRCUIT. NEXT GENERATION MILITARY SYSTEMS WOULD BENEFIT FROM A MONOLITHIC DESIGN WHICH INCORPORATES THE GUNN DIODE AND ITS ASSOCIATED MATCHING CIRCUITRY ONTO ONE GAAS SUBSTRATE. THIS APPROACH OFFERS SEVERAL ADVANTAGES WHICH INCLUDE LOWER UNIT COST, BETTER REPRODUCIBI ...

    SBIR Phase I 1987 Department of DefenseArmy
  6. VARIABLE PRESSURE AND HIGH TEMPERATURE CLOSED BOMB FOR LASER IGNITION STUDIES

    SBC: M.L. ENERGIA, INC.            Topic: N/A

    PHOTOLYSIS HAS BEEN IDENTIFIED AS A MEANS OF INITIATING AND ENHANCING GAS, LIQUID AND SOLID PHASE CHEMICAL REACTIVITY. A NUMBER OF RECENT OPPORTUNITIES FOR PHOTOCHEMICAL AUGMENTATION INVOLVE CHEMICAL SYSTEMS AT ELEVATED AND VARIABLE TEMPERATURE AND PRESSURE. CONSEQUENTLY, THERE EXISTS THE NEED TO GATHER FUNDAMENTAL PHOTOCHEMICAL DATA UNDER THE SEVERE CONDITIONS ATTENDANT TO GAS PHASE EXPLOSIVES, A ...

    SBIR Phase I 1987 Department of DefenseArmy
  7. VORTEX DYNAMICS FOR ROTORCRAFT INTERACTIONAL AERODYNAMICS

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  8. RESEARCH IN ARTIFICIAL INTELLIGENCE FOR NON-COMMUNICATION ELECTRONIC WARFARE SYSTEMS

    SBC: ELECTRO-RADIATION, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseArmy
  9. SHAPE CHARGE INITIATION OF HIGH EXPLOSIVE AND CARGO PROJECTILES

    SBC: Inc.ubator Technologies Inc.            Topic: N/A

    CURRENT FUZES FOR CARGO DISPENSING PROJECTILES CAN ALSO BE FITTED WITH A HIGH EXPLOSIVE (HE) BOOSTER PELLET AND USED TO INITIATE HE BURSTER TYPE PROJECTILES. ITI PROPOSES TO DEVELOP A SHAPE CHARGE FUZE THAT WILL DETONATE BOTH PROJECTILES. THE PHASE I EFFORT WILL INCLUDE ANALYSIS OF THE EXISTING PROJECTILE CONFIGURATIONS AND EXPLOSIVE/PROPELLANT CONTENT, SELECTION OF A SUITABLE SHAPE CHARGE CONFIGU ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. DEMONSTRATION OF HIGH LIFT TO DRAG RATIO ROGALLO WING

    SBC: Flight Dynamics Inc            Topic: N/A

    THE PROJECT WILL BE DEVOTED TO SELECTING AN OPTIMUM CONFIGURATION AND RUNNING 1/4 SCALE MODEL TESTS OF A ROGALLO TYPE WING. THE WING WILL HAVE HIGHER THAN USUAL ASPECT RATIOS FOR ROGALLO WINGS, AND WILL BE AIR DEPLOYABLE. A CONTROL SYSTEM TO AUTOMATICALLY LAND THE VEHICLE WILL BE DEVELOPED. FINAL DESIGN OF A FULL SCALE VEHICLE WILL BE DELIVERED.

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government