You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Technology for Affordability
SBC: CHESAPEAKE SCIENCES CORP. Topic: N/AThe towed array capabilities of the US Navy combine high reliability, high channel count, long aperture and low self noise to provide an underwater acoustic superiority not matched by any other Navy. This superiority has also brought with it unwanted high production costs for these arrays. The next generation of Naval towed arrays with increasingly larger aperture may be out of the reach of a cos ...
SBIR Phase I 1998 Department of DefenseNavy -
Tethered Aerostat Communication Link Application
SBC: Tcom, Limited Partnership Topic: N/AThe Phase I project effort will develop a rapidly deployable aerostat system capable of elevating communications relay equipment to an altitude of approximately 600 meters for the transmission and reception of voice and data information to U.S. Navy vessels in a logistic support mode. The aerostat system will supply the connectivity between the logistic support group and the sea-based end of a ...
SBIR Phase I 1998 Department of DefenseNavy -
THE REQUIREMENT FOR ANGLE MEASUREMENT IN THE PRESENCE OF TRANSLATION IS NOT UNCOMMON, YET TRADITIONAL ANGLE ENCODERS DO NOT ACCOMMODATE TRANSLATION, EVEN WHEN THE MEASUREMENT ANGLE IS SMALL.
SBC: OPTELECOM, INC. Topic: N/ATHE REQUIREMENT FOR ANGLE MEASUREMENT IN THE PRESENCE OF TRANSLATION IS NOT UNCOMMON, YET TRADITIONAL ANGLE ENCODERS DO NOT ACCOMMODATE TRANSLATION, EVEN WHEN THE MEASUREMENT ANGLE IS SMALL. THE PROPOSED TECHNICAL APPROACH INVOLVES A NOVEL POSITION ENCODING ARRANGEMENT IN WHICH AN ABSOLUTE POSITION MEASUREMENT IS DERIVED FROM A SINGLE WIDE ENCODED TRACK WITH A NOVEL PATTERN OF DARK AND LIGHT BARS ...
SBIR Phase I 1984 Department of DefenseNavy -
THIS PROPOSAL DESCRIBES THE STEPS INVOLVED IN SCOPING AND PERFORMING THE PRELIMINARY DESIGN OF A MULTI-MICRO-COMPUTER BASED SYSTEM FOR SIMULATING ELECTRONIC (OR OTHER) SUBSYSTEMS IN REAL TIME IN A MODULAR, EXPANDABLE AND INEXPENSIVE FASHION.
SBC: Integral Systems Inc Topic: N/ATHIS PROPOSAL DESCRIBES THE STEPS INVOLVED IN SCOPING AND PERFORMING THE PRELIMINARY DESIGN OF A MULTI-MICRO-COMPUTER BASED SYSTEM FOR SIMULATING ELECTRONIC (OR OTHER) SUBSYSTEMS IN REAL TIME IN A MODULAR, EXPANDABLE AND INEXPENSIVE FASHION. THE PHASE I STUDY EFFORT IS EXPECTED TO LEAD TO A PROTOTYPE DEVELOPMENT EFFORT WITH SPECIFIC SELECTED APPLICATIONS IMPLEMENTED IN SOFTWARE FOR FEASIBILITYDEMO ...
SBIR Phase I 1984 Department of DefenseNavy