You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Failure Engineering and Analysis Toolkit (FEAT)

    SBC: Rise            Topic: N/A

    The purpose of this Phase I proposal is to investigate the feasibility of developing a comprehensive Failure Engineering and Analysis Toolkit (FEAT) that can be seamlessly integrated with a variety of data tools over ODBC/SQL. The research will focus on mechanical parts failure data and analysis for both the production and design stages of a product's life cycle. Elements of FEAT will include a ...

    SBIR Phase I 1995 Department of Commerce
  2. Advanced Digital Man-Machine Interface Analysis

    SBC: Ryan Nuclear, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. A Calorimeter for the Nondestructive Assay of Tritium-Contaminated Samples

    SBC: Science Research Laboratory, Inc            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Commerce
  4. Innovative Magnetic NDE System for Micromagnetic Imaging

    SBC: SFA, INC.            Topic: N/A

    This project is investigating the application of magnetic recording and micromachine technologies to the development of a novel magnetic nondestructive evaluation (NDE) system. Magnetic NDE methods based on Barkhausen signal detection and analysis can provide valuable information about the state of stress of steel materials. However, Barkhausen signals do not appear to be correlated with the ext ...

    SBIR Phase I 1995 Department of Commerce
  5. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  6. A Multi-Trip, Free Drop Buoy for the Measurement of Shallow Physical/Optical Properties

    SBC: Webb Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Commerce
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government