You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Rapid Freezing Injection Molding and Sublimation Process for Fabrication of Controlled Fragmentation Tungsten Warheads

    SBC: CPS TECHNOLOGIES CORP.            Topic: A22BT005

    Tungsten (W) has been considered for warhead applications as it has a high density, potentially resulting increased lethality from small, low drag, high kinetic energy fragments at increased or predictable standoff distances.  Injection molding (IM) is considered to be the low-cost fabrication high production volume approach for production providing features that promote fragmentation without m ...

    STTR Phase I 2022 Department of DefenseArmy
  2. Compact, Low-Cost, Biogas Reformer for 3 kW SOFC Power Generator

    SBC: ASPEN PRODUCTS GROUP INC            Topic: A22BT009

    Ever-increasing demands for power and energy have tethered military field personnel to long logistic tails that limit the ability to maneuver and make resupply convoys prime targets for attack.  The deployment of new power sources with greater efficiencies, increased energy densities, and reduced thermal and acoustic signatures will facilitate improvements to communications, weapons, and support ...

    STTR Phase I 2022 Department of DefenseArmy
US Flag An Official Website of the United States Government