You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Cryogenic Quick-Disconnect Seals

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  2. A TEST RIG FOR MEASURING THERMAL PERFORMANCE OF STIRLING CYCLE REGENERATORS

    SBC: Sunpower, Inc.            Topic: N/A

    DESIGN, DATA REDUCTION ANALYSIS, FABRICATION AND INITIAL TESTING WILL BE PERFORMED FOR A STIRLING-CYCLE TEST RIG CAPABLE OF MEASURING THERMAL FLUX ACROSS REGENERATORS UNDER OSCILLATING FLOW CONDITIONS SIMILAR TO THOSE ENCOUNTERED IN MODERN STIRLING MACHINES. THIS WILL BE ACHIEVED BY THE ADDITION OF A HEAT-TRANSFER SUBASSEMBLY TO AN EXISTING PRESSURE-DROP TEST RIG. BOTH THE RIG AND THE DATA REDUCTI ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  3. Regenerator-Displacer for a Stirling Micro-Refrigerator for Cold Electronics

    SBC: Sunpower, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. GAAS RISC ARRAY PROCESSOR

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    SYSTEMS & PROCESSES ENGINEERING CORPORATION (SPEC) HAS DEVELOPED AN INNOVATIVE ARRAY PROCESSOR ARCHITECTURE FOR COMPU- TING FOURIER TRANSFORMS AND OTHER COMMONLY USED SIGNAL PROCESSING ALGORITHMS. THIS ARCHITECTURE IS DESIGNED TO EX-TRACT THE HIGHEST POSSIBLE ARRAY PERFORMANCE FROM STATE-OF- THE-ART GAAS TECHNOLOGY. THE ARCHITECTURAL DESIGN FEATURES A HIGH PERFORMANCE RISC PROCESSOR IMPLEMENTED IN ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  5. Embedded-Optical-Fiber, Near-Infrared Fluorosensor for NDE of Aerospace Systems

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  6. Merlin Components for Real-Time, Fault-Tolerant, Distributed Computing

    SBC: SYSTRAN FEDERAL CORP.            Topic: N/A

    SYSTRAN proposes research into a new approach to very high-speed, heterogenous computer interconnection environments. This memory-based interconnection system would be able to provide extremely high-performance in distributed multicomputer environments which are directly applicable to the National Critical Technologies Information and Communications subtopic: 'high-performance computing and networ ...

    SBIR Phase I 1994 National Aeronautics and Space Administration
  7. Improved Anode Materials for the Solid-Oxide Fuel-Cell and Electrolyzer System

    SBC: TECHNOLOGY MANAGEMENT INC            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  8. TELEBROBOTIC DIGITAL CONTROLLER SYSTEM

    SBC: The Navtrol Company, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS DEVELOPMENT OF A SMALL, LIGHTWEIGHT, HIGH CAPABILITY, MULTI-PROCESSOR TELEROBOTIC CONTROLLER SYSTEM. THE SYSTEM IS TO CONSIST OF AN INTERCONNECTION OF SEVERAL ROBOTIC JOINT CONTROLLERS AND A SINGLE MASTER CONTROLLER COMMUNICATING THROUGH A HIGH SPEED SERIAL COMMUNICATION BUS. THE MASTER CONTROLLER CONTROLS COMMUNICATION WITH THE VARIOUS JOINT CONTROLLERS I ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  9. ENERGY-MODULATED TOXIC VAPOR DETECTOR

    SBC: Transducer Research Inc.            Topic: N/A

    MODULATION OF THE CONCENTRATION OF A TOXIC VAPOR TO BE DETECTED CAUSES A TIME-DEPENDENT SIGNAL TO BE GENERATED IN THE DETECTION DEVICE. TYPICALLY, THIS TIME-DEPENDENT SIGNALIS IGNORED AND ONLY STEADY-STATE OR EQUILIBRIUM DETECTOR VALUES ARE USED. HOWEVER, THIS TIME-DEPENDENT SIGNAL CAN BEMADE TO CONTAIN VERY USEFUL INFORMATION ABOUT THE IDENTITY AND CONCENTRATION OF THE TOXIC VAPOR. IN THIS PHASE ...

    SBIR Phase I 1989 National Aeronautics and Space Administration
  10. Novel Method for DBP Precursor Removal

    SBC: Universal Fuel Development            Topic: N/A

    N/A

    SBIR Phase I 1994 Environmental Protection Agency
US Flag An Official Website of the United States Government