You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the design and development of “MySidewalk,” a mobile application that will facilitate the crowd-sourced collection of sidewalk inventory and condition assessment data. The proposed tool will utilize the recent advances in social networks, mobile data collection, and data mining to provide integrated sidewalk datasets. The proposed tool ...

    SBIR Phase I 2015 Department of Transportation
  2. Management System Display to Track Emergency Response Vehicles and Mutual Aid During a Crash Response

    SBC: LYNNTECH INC.            Topic: 142FA2

    We present the National Incident Visualization System, NIVS. NIVS is a combination of software elements that leverage the capabilities and prevalence of smart-phone technology to create a single point of reference for aggregated information and information sharing during a fire-based emergency at an airport. NIVS aggregates GPS location and status information from personnel and resources with Airp ...

    SBIR Phase I 2015 Department of Transportation
  3. Wireless Compatible Digital Train Line (WiDTL) for Passenger Type Vehicles in a Train Consist

    SBC: Sharma & Associates, Inc.            Topic: 151FR1

    This project seeks to define the performance requirements for a wireless Digital Train Line (WiDTL) through definition of functionality and performance expected, and translating these into network equipment specifications and architecture that wireless network equipment manufacturers can build towards. The effort will include an in-depth review of wireless technology as it applies to sensitive and ...

    SBIR Phase I 2015 Department of Transportation
  4. Next Generation Freight Truck for Autorack Cars

    SBC: Sharma & Associates, Inc.            Topic: 151FR3

    Autorack cars transport one of the most valuable commodities – fully assembled Automobiles. Due to the longer and higher profile of an Autorack and the fact that heavy automobiles are loaded on to high deck levels, freight trucks with improved track-to-vehicle dynamics as well as higher speed capabilities are desired in anticipation of higher speed passenger service and shared corridors. Unique ...

    SBIR Phase I 2015 Department of Transportation
  5. Technology to Improve upon APC Data Counting that will Provide Better Correlation to Service Plan

    SBC: TRAFFAX INC.            Topic: 142FT1

    To provide quality services and reduce operating costs, it is important for transit agencies to know the transit passenger origin and destination (OD) demand. Such demand often changes over time and season and is critical for optimizing transit schedules and improving transit network design. It is also useful for adjusting transit service plans in response to emergency situations such as the Marat ...

    SBIR Phase I 2015 Department of Transportation
  6. Development of Innovative Welding for High Performance Bridge Steel

    SBC: KAI, LLC            Topic: 132FH1

    With this research, we would like to provide new materials joining methods to the DOT. This will be achieved with a pulse energy store that has already demonstrated game changing capability in welding a wide variety of metals and alloys. The process we are proposing is known as Homopolar Welding. The weld is created by a solid state fusion welding process whereby high current is passed through ...

    SBIR Phase II 2015 Department of Transportation
  7. Self-Contained Sub Centimeter Positioning Platform

    SBC: TRUNAV LLC            Topic: 812N

    The goal of this project is to develop, prototype, and experimentally validate a new Differential Global Navigation Satellite System (DGNSS) capable of providing sub-centimeter positioning accuracy for quasi-static scientific, survey, and structural health monitoring application. The main feature of the proposed DGNSS solution is that it leverages publically available GNSS reference data from exis ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  8. New METSAT Display Service for Weather-Ready Nation

    SBC: CARR ASTRONAUTICS CORP            Topic: 843WP

    Phase II of the New METSAT Display project will produce a working beta version of the Earth Imaging product customized for NWS/NOAA as outlined in the Phase I proof of concept. This product will ingest imagery from a data source (in this case a web service of NOAA satellite imagery) and display it accurately on a globe of the Earth. Vector data such as roads, cities, towns, counties, states, etc. ...

    SBIR Phase II 2015 Department of CommerceNational Oceanic and Atmospheric Administration
  9. An On-Board Eco-Approach and Departure System for Transit Vehicles

    SBC: Sabra & Associates, Inc.            Topic: 151FT1

    This research is designed to develop a methodology that will review the real-time location and route of a transit vehicle, correlate them with real-time and predicted signal phasing and timing (SPAT) information from traffic signals and communicate via existing mediums eco-approach and departure information to transit vehicles through onboard Mobile Data Terminals (MDTs) or an in-vehicle Human-Mac ...

    SBIR Phase I 2015 Department of Transportation
  10. New METSAT Display Service for Weather-Ready Nation

    SBC: CARR ASTRONAUTICS CORP            Topic: 84

    NOAA has identified a problem with the display and usability of satellite imagery on NWS websites. This proposal provides analysis of the feasibility and usability of a proposed system to address this concern. Our goal in the project is to create a heuristically sound conceptual design and tool set for display and interaction with satellite imagery on the NWS site. The project will also explore ...

    SBIR Phase I 2014 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government