You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PC-Based Real-Time Infrared/Millimeter Wave Scene Generator

    SBC: CG2, Inc.            Topic: N/A

    In order to eliminate costly redesign and re-development of digital and HWIL simulations for IR sensors, the U.S Army has recognized the need for a commonality between IR Scene generators for these domains. Currently, digital (non-real-time) and HWIL(real-time) simulations for IR sensor development and testing are custom designed by vendors. Algorithms and performance are then verified, validated ...

    SBIR Phase I 2003 Department of DefenseArmy
  2. Small GPS Controlled Reception Pattern Antenna for Aircraft

    SBC: Sciperio, Inc.            Topic: N/A

    Not Available Intelligent Automation Inc. (IAI) proposes to design, implement and demonstrate a two-level learning system for autonomous devices. There are several novel aspects of the propose architecture. It incorporates the basic reflex-type behaviors of reactive systems with goal directed behavior of deliberative systems. It also offers a means for automatically programming the reflex beha ...

    SBIR Phase I 1999 Department of DefenseNavy
  3. N/A

    SBC: Sciperio, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseDefense Advanced Research Projects Agency
  4. Low Profile Confomal Designs for the VHF/UHF Laminated Antenna

    SBC: Sciperio, Inc.            Topic: N/A

    Conformal antennas for VHF/UHF have multiple uses, but the Phase I effort by Sciperio was focused on the design of a SLICE band omni-directional UHF antenna for integration within a soldiers helmet. The Phase I results for this conformal concept wereproof of the feasibility of designing an antenna capable of being integrated within or onto the surface of a Kevlar helmet. The antenna consists of ...

    SBIR Phase II 2003 Department of DefenseArmy
  5. Low Profile Confomal Designs for the VHF/UHF Laminated Antenna

    SBC: Sciperio, Inc.            Topic: N/A

    Conventional antennas are often not suitable for military applications due to shape and size constraints imposed by the competing demands for good radio-frequency-specific electromagnetic resonance with high durability and low visibility. Consequently,numerous varieties of antennas have been created over the years to help solve these electrical and mechanical constraints. Sciperio has developed ...

    SBIR Phase I 2003 Department of DefenseArmy
  6. Wavelength Division Multiplexing Fiber Optic Microwave Delay System

    SBC: CUSTOM MICROELECTRONIC SYSTEMS, INC.            Topic: N/A

    The objective of this Phase II proposal is to build, test, and deliver a programmable fiber-optic delay line capable of delaying an instantaneous bandwidth from 4 to 12 GHz from 0 to > 20 msecs, programmable in 10 nsec steps. The proposed delay line willimplement DWDM fiber-optic technology to minimize optical fiber while achieving an infinite capture time. A recent study involving an experiment ...

    SBIR Phase II 2003 Department of DefenseArmy
  7. Concept Development and Assessment of a Multi-Mode Seeker for the National Missile Defense Exotmospheric Kill Vehicle

    SBC: DAVIDSON TECHNOLOGIES INC            Topic: N/A

    This Phase II SBIR will result in the design, fabrication and demonstration of advanced components for a semi-active RF sensor for the EKV of the Ground based Midcourse Defense System (GMDS). The baseline concept is derived from the results of the Phase ISBIR titled Concept Development and Assessment of a Multi-Mode Seeker for the NMD EKV. That effort identified the key technologies required to pr ...

    SBIR Phase II 2003 Department of DefenseMissile Defense Agency
  8. AN EFFICIENT, LONG LIFE, LIGHTWEIGHT, LOW COST REFRIGERATION SYSTEM USING A SOLID MAGNETOCALORIC MATERIAL AS THE REFRIGERANT

    SBC: DEAN APPLIED TECHNOLOGY CO., INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseMissile Defense Agency
  9. Mission Adapting Graphics for Risk and Injury Prediction Platform

    SBC: DESC, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseDefense Threat Reduction Agency
  10. Decision Support for Rapid Deployment Planning at Air Ports of Embarkation

    SBC: DESE RESEARCH, INC.            Topic: N/A

    Using Popkin? System Architect 2000 (SA2000), our primary C4ISR compliantmodeling tool used in the design and implementation of enterprise-wideinformation systems, we will demonstrate the feasibility of determininghindrances to deployment. DESE enhancements to SA2000 allow us to completethe C4ISR framework while providing additional diagrams and reports to helpclients understand their enterprise m ...

    SBIR Phase I 2003 Department of DefenseArmy
US Flag An Official Website of the United States Government