You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Public Rights-of-Way Assessment Instrumentation to Determine Accessibility

    SBC: BENEFICIAL DESIGNS INC            Topic: 081FH2

    City planners and engineers need detailed assessments of public rights-of-way to evaluate existing conditions, determine compliance with draft accessibility guidelines, and plan reconstruction projects. Current assessment methods are inadequate and inefficient due to the time and resources required. This project will develop an automated public rights-of-way assessment process and the measuremen ...

    SBIR Phase II 2010 Department of Transportation
  2. Smart Grade Crossing Monitor System

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 101FR2

    During Phase I, IEM developed a proof of concept for a Smart Grade Crossing Monitor (SGCM) using multispectral imaging technology for enhanced monitoring of highway rail grade crossings to improve safety by providing warnings of significant objects present in the crossing. The Phase I work conclusively demonstrated that multispectral imaging is clearly superior to visible or infrared spectrum imag ...

    SBIR Phase II 2011 Department of Transportation
  3. Crossing Hazard Intelligent Alert System (CHIAS)

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 101FR2

    Railroad grade crossings remain one of the primary locations for fatal or near-fatal accidents involving rail vehicles. Multiple attempts to prevent such accidents by means such as signals and gates are severely hampered both by expense of installation and by the fact that many accidents are caused by vehicle drivers or pedestrians deliberately or through inattention ignoring or evading warnings ...

    SBIR Phase I 2010 Department of Transportation
  4. Intelligent Dimension Evaluation and Alerting System (IDEAS)

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 111FH3

    International Electronic Machines (IEM) Corp. will develop the Intelligent Dimension Evaluation and Alerting System, or IDEAS.  In Phase I, IEM will examine two different approaches for achieving the goal of accurate, reliable dimensioning and classification of moving vehicles at highway speeds.  IDEAS will leverage prior work by IEM for the Federal Railroad Administration (FRA), New York State

    SBIR Phase I 2011 Department of Transportation
  5. Environmental Pavement Monitor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of asphalt and concrete pavement so that timely maintenance can maximize their usefulness. This SBIR will develop a sensor that can be embedded within concrete or asphalt, which can measure moisture, temperature, stress and strain. It will provide critical data for evaluating pavement performance starting with th ...

    SBIR Phase II 2009 Department of Transportation
  6. Transportation Autonomous Device

    SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION            Topic: 101FR4

    Railroad yards are in constant movement with potentially thousands of train cars moving over miles of track compressed into a limited area. The harsh environment presents many safety hazards for railroad workers who must move through this environment and perform assigned tasks. Job related injuries cost he railroads over $1 billion annually and from 2008 30.3% of those injuries occurred in the r ...

    SBIR Phase I 2010 Department of Transportation
  7. Interactive Language Trainer

    SBC: PROGRESSIVE EXPERT CONSULTING, INC.            Topic: SOCOM06010

    PEC proposes to work on advanced curriculum development in order to integrate into an advanced gaming environment. To this end, PEC will adapt existing USSOCOM curriculum and provide guidance to developers in order to implement the curriculum. In addition, PEC will create avatars which can teach and demonstrate cultural gestures. These avatars will be advanced such that a user can take control of ...

    SBIR Phase II 2008 Department of DefenseSpecial Operations Command
  8. Tactical Biometric Registration and Recognition Suite

    SBC: Ultra-Scan Corporation            Topic: SOCOM06004

    The proposed development effort will result in a prototype of the industry’s first ultrasonic 4-4-2 slap and rolled impression fingerprint scanner, offering superior image quality, 93% reduction in size, and 86% reduction in weight as compared to existing optical solutions on the market today. The total capture device will measure approximately 3.5’’ by 4.0’’ by 0.75’’, have a weight ...

    SBIR Phase II 2007 Department of DefenseSpecial Operations Command
  9. Vertical Wind Profile Data Collection Using Laser Technology on Unmanned Delivery Platforms.

    SBC: OCEANIT LABORATORIES INC            Topic: SOCOM04007

    The current project will develop and demonstrate a prototype compact, power-efficient all-fiber lidar unit for wind profiling on board UAV's and other aircraft. The system leverages Oceanit's current fiber-laser based lidar development efforts. A unique design provides a rugged system with no moving parts and little maintenance requirements. Efforts in the current project will include prototype s ...

    SBIR Phase II 2006 Department of DefenseSpecial Operations Command
  10. Concrete Environmental Monitoring Sensor

    SBC: AVS US INC            Topic: 07FH3

    With infrastructure costs escalating it is becoming essential to monitor the health of concrete structures so that timely maintenance can maximize their useful lives. This SBIR will demonstrate the feasibility of using a passive sensor, embedded within concrete, to measure mositure, temperature, pH and concentrations of chlorides. It will provide critical data for evaluating concrete performance s ...

    SBIR Phase I 2008 Department of Transportation
US Flag An Official Website of the United States Government