You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Hidden In Plain Sight (HIPS) Wind Turbine Technology to Augment ACE Expeditionary Air Base Energy Self Sufficiency

    SBC: CBC, LLC            Topic: X224OCSO1

    CBC’s HIPS solution is a low-profile, omni-directional wind turbine that can be rapidly deployed and safely emplaced anywhere on an Agile Combat Employment (ACE) airfield without risking aircraft collisions, disrupting radar, nor requiring re-deployment t

    SBIR Phase II 2023 Department of DefenseAir Force
  2. Short-Range Sonic Projection System for Focused Surreptitious Communication Indiscernible to Others

    SBC: RESONADO, INC.            Topic: X224ODCSO1

    Military engineers are looking to revolutionize communications by introducing a new project that seeks to bridge gaps in current military communications capabilities. The United States Air Force (USAF) is facing a daunting readiness challenge in preparation for a new type of asymmetric warfare and “multi-domaine” conflict. Even the slightest dip in mission-capable rates can have significant ef ...

    SBIR Phase II 2023 Department of DefenseAir Force
  3. Next Generation Headset System for Battlefield and Support Operations

    SBC: RESONADO, INC.            Topic: X224ODCSO1

    Resonado will develop a Next Generation Headset System, utilizing its latest acoustic innovation, FCS Micro Transducer technology, which enables improved reliability, reduced bulkiness, and clearer communication for headsets. This will provide concise, clear communications between aircrew and ground crew, mitigating loss of transmission and increasing effectiveness for operations. We held numerous ...

    SBIR Phase II 2023 Department of DefenseAir Force
  4. Continual Readiness Supply System

    SBC: Trek10 Inc.            Topic: AF2310018

    The proposed Phase I project aims to design an automated sourcing supply solution that uses event-driven architecture to integrate DoD information systems and other developmental technology to bridge current Air Force maintenance operations and logistic s

    SBIR Phase I 2023 Department of DefenseAir Force
  5. Feasibility and proof of concept of a dense, low cost, network of sensors driving Intelligent building Agents for air quality and energy control.

    SBC: XMARK LABS, LLC            Topic: 6

    Commercial buildings use 35% of the entire US energy output, and up to a third of that energy is wasted. Rapidly rising fuel costs, increasing concern about climate change, and policy directives from the Biden Administration are all driving the need for increased energy efficiency and the elimination of waste. At the same time, the COVID-19 pandemic has dramatically increased public awareness of t ...

    SBIR Phase I 2023 Department of CommerceNational Institute of Standards and Technology
  6. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  7. Wide Bandgap Bi-Directional Converter Phase II

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A214030

    The objective of this effort is to demonstrate a 600 Vdc to 28 Vdc, isolated bi-directional power converter that utilizes wide bandgap semiconductors and can operate across a range of military ground vehicles.  The proposed converter is based on a modular topology that contains a combination of GaN and SiC devices, provides at least 15 kW bi-directional power flow continuously, and satisfies the ...

    SBIR Phase II 2023 Department of DefenseArmy
  8. Power Management for Energy Resiliency

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: A224015

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  9. Active Thermal Control System Optimization

    SBC: PC KRAUSE & ASSOCIATES INC            Topic: N152115

    The primary objective of this effort will be the development, demonstration, and validation of a new suite of modeling and simulation capability for Navy analysis needs. The tool suite will utilize a new framework for implementing components models that will allow users to more easily access multiple analytical domains, including steady-state on-design and dynamic off-design. A new suite of tools ...

    SBIR Phase II 2023 Department of DefenseNavy
  10. Deep Learning Classifier to Support DoD Supply Chain Diversity & Resiliency through Automated Data Labeling and Summarization

    SBC: THIRD COAST FEDERAL INC            Topic: AFX235CSO1

    Small business is the engine of innovation and job and wage growth in the US. It is also a critical component of the United States Department of Defense (DoD) supply base. Nevertheless, over the last decade the number of small businesses in the defense in

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government