You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Long Length Welded NbTi CIC Superconducting Cable for Accelerators Applications
SBC: HYPER TECH RESEARCH INC Topic: 23iHyper Tech proposes to develop a long-length structured cable for use in superconducting accelera- tor magnets. The Medium-energy Electron-Ion Collider (MEIC) is a proposed colliding beam facility in which polarized beams of ions and electrons would be collided at energies up to ~100 GeV/u for ions and 20 GeV for electrons. The arc lattice for its ion ring would contain a total of 128 half-cells, ...
STTR Phase I 2016 Department of Energy -
A Comprehensive Web Infrastructure for Standardizing, Storing, and Launching Density Functional Calculations of Materials and Chemical Compounds
SBC: Citrine Informatics, Inc. Topic: 09aDensity functional theory is used by many researchers funded by the Department of Energy as a method for predicting the behavior of chemicals and materials used in energy applications. However, results of these calculations are often not standardized and, even when they are, expert-level understand of the methods is needed in order to properly perform a simulation. The energy research community a ...
STTR Phase I 2016 Department of Energy -
Water Filtration Membranes with Built-in Continuous De-Fouling
SBC: GLOBAL RESEARCH & DEVELOPMENT INC Topic: 12aThis proposal is in response to the DOE topic 12a on membrane technology, which represents an important method in water purification and recovery for industrial and environmental applications. Energy-related cost and water waste are significant issues with reverse osmosis (RO) membrane commonly used today and increased attention is being given to Nano-filtration (NF) technology. NF covers treatmen ...
STTR Phase I 2016 Department of Energy -
Membranes and Materials for Energy Efficiency- Subtopic d) Other. Title: Polysulfide-Blocking Polymer Membrane Separators for Rechargeable Lithium-Sulfur Batteries
SBC: Sepion Technologies Topic: 12aRenewable sources of energy including solar and wind are fast gaining ground on fossil fuels, in part because of their sustainability and environmental benefits. A major issue, however, has been finding efficient ways to store the energy that renewables generate for use when the demand for energy is high. Lithium-‐sulfur batteries, which store electrical energy by transferring electrons to or ...
STTR Phase I 2016 Department of Energy -
Enhance Full-Waveform Inversion with Machine Learned Low-Frequency Signals
SBC: ADVANCED GEOPHYSICAL TECHNOLOGY INC Topic: 21bNovel discoveries are going to prove essential for attaining a significant percentage of oil output rather than solely depending on existing fields to keep up with the energy demanding of the United States. As one of the critical sectors of Exploration and Production, seismic surveys are used to produce detailed images of local geology to determine the location and size of possible oil and gas res ...
STTR Phase I 2019 Department of Energy -
Novel Polymer-electrolyte Membrane Development for Carbon Dioxide Conversion to Solar Fuel
SBC: TWELVE BENEFIT CORPORATION Topic: 19bSustainable fuels and chemicals production is necessary for the future of the global economy. Opus 12 has developed an electrochemical process to convert CO2 into solar chemicals and fuels. Key to our process is a new polymer-electrolyte membrane design that enables CO2 electroreduction in existing a polymer-electrolyte membrane (PEM) electrolyzer hardware. PEM electrolyzers are ideal for coupling ...
STTR Phase I 2019 Department of Energy -
High power, magnet-free, circulator using angular-momentum biasing of a resonant ring
SBC: CALABAZAS CREEK RESEARCH, INC. Topic: 25There is a continuing need for high power circulators to protect the next generation of high power RF sources from waveguide reflections that can destroy the device. Currently, the power level of circulators is limited by the materials, specifically ferrites that provide the required non-reciprocal operation. New approaches are required that use materials capable of very high power operation. Stat ...
STTR Phase I 2016 Department of Energy -
Nanoscale Metal Oxide Coatings for Corrosion Protection of Superalloy Materials
SBC: CALABAZAS CREEK RESEARCH, INC. Topic: 14dThe Brayton cycle for power generation offers significant advantages over the Rankin cycle typically used. Unfortunately, the Brayton cycle uses very high pressure and high temperature, supercritical CO2 (sCO2) as the heat transfer fluid. New materials that can handle the harsh environment of sCO2 are required to enable power generation and prevent issues with corrosion and erosion or efficiency d ...
STTR Phase I 2016 Department of Energy -
Realization of Mulitlayer High Temperature Capacitors with New Dielectric Materials and Novel Thermal Spray Deposition Route
SBC: DRS RESEARCH Topic: 01aThe main focus of this STTR is to design, develop, and evaluate high temperature capacitors using novel thermal spray coating processes, which will allow the devices to meet the performance requirements. Multilayer coating architecture will be adopted and the electrodes and dielectric material selections will be screened in Phase I to note material compatibility and high temperature performance. ...
STTR Phase I 2013 Department of Energy -
Superalloy MMC Components for Advanced Turbine Systems
SBC: ADVANCED POWDER SOLUTIONS INC Topic: 18Advanced turbine component manufacturing process by conventional processes are comprised of multiple steps, turbine components are machined from a forged or rolled billet originally made from casting/ingot metallurgy. As a result a long lead times are required prior to acquisition. General Statement of how this problem being addressed: Rapid fabrication of this component can be done by Additive Ma ...
STTR Phase I 2016 Department of Energy