You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Permanent Magnet (PM) Induction Heater for Paraffin Abatement

    SBC: AUSTIN GEOTECH SERVICES INC            Topic: 20b

    There are an estimated 1.7 million oil and gas wells in the United States, 771,000 of these are considered marginal producers. Combined they make up 11.3% of the US oil production and 8.3% of the US gas production. In that last 10 years, over 131,000 of these oil wells and 48,000 gas wells have been plugged and abandoned. Most of these wells suffer from paraffin plugging problems. The only way to ...

    STTR Phase II 2019 Department of Energy
  2. High-Speed Platform for Highly Parallel STM lithography and Hierarchical Assembly

    SBC: Zyvex Labs LLC            Topic: 17e

    Nanotechnology has failed to live up to its promise of exploiting the emerging properties at the nanoscale because of the lack of manufacturing precision thus denying society many energy saving materials and applications. There is therefore a strong need to realize the promise of complex nanosystems by developing atomically precise manufacturing (APM). This project targets a key component of an At ...

    STTR Phase II 2019 Department of Energy
  3. Fidelity Enhancement of Nuclear Power Plant Simulators Utilizing High Fidelity Simulation Predictions

    SBC: WESTERN SERVICES CORPORATION            Topic: 30c

    Accurate simulation of nuclear power plant behavior is necessary for both engineering and training applications. An engineering grade simulator, used for design, safety analysis and operations, is characterized by high fidelity, computational power, lack of real-time capability, and user non-interactive environment. By contrast, a training grade simulator, used for operator training and education, ...

    STTR Phase II 2019 Department of Energy
  4. High Performance Substrate Embedded Microgrids for High Efficiency, Flexible Organic Light Emitting Diodes

    SBC: ELECTRONINKS INCORPORATED            Topic: 09b

    Indium tin oxide (ITO) films are currently the most widely used transparent conductor in optoelectronic applications. However, ITO suffers from several major technological and economic limitations for large area applications such as inadequate performance, high cost, and brittleness. The primary objective of this Small Business Technology Transfer (STTR) Phase I/Phase II project is to develop the ...

    STTR Phase II 2019 Department of Energy
US Flag An Official Website of the United States Government