You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 31e. Pressurized Gas Beam Monitor for Extremely High Intensities

    SBC: MUPLUS INC.            Topic: 31e

    A novel pressurized gasfilled multiRFcavity beam profile monitor has been studied that is simple and robust in highradiation environments. Charged particles passing through each RFcavity in the monitor produce intensitydependent ionized plasma, which changes the gas permittivity. Standard RF techniques to measure the change in quality factor (Q) and frequency (f) as a function of time are then use ...

    STTR Phase II 2016 Department of Energy
  2. Long Length Welded NbTi CIC Superconducting Cable for Accelerators Applications, Topic 23i

    SBC: HYPER TECH RESEARCH INC            Topic: 23i

    Hyper Tech is developing a long-length superconducting NbTi CIC cable that can improve the performance/cost for a new DOE colliders plus energy and medical applications like MRI and SMES.

    STTR Phase II 2017 Department of Energy
  3. Repair of Materials Degradation in Light Water Reactor Components

    SBC: UES SERVICES INC            Topic: 08c

    Corrosion induced degradation of material components in the harsh environment of light water reactor can impact reactor reliability, availability, safe operation and eventually life. A possible remedy could be to replace the replaceable components at appropriate moments which may not be economically favorable. Thus there is a need to develop technologies to repair degraded materials. STATEMENT OF ...

    STTR Phase II 2016 Department of Energy
  4. Combat Systems of the Future

    SBC: Advanced Systems/Supportability Engineering Technologies And Tools, Inc.            Topic: N05149

    The S-351 mini-sub is a prototype of the Dry Combat Submersible (DCS). This prototype was established as a means of risk reduction prior to a full commitment to the DCS program. Both of these platforms have an operational need to transit with minimum operator fatigue safely to a pre-defined point and covertly deploy and retrieve SEALS. To meet these operational needs, these platforms require upgra ...

    STTR Phase II 2017 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government