You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 61 - 70 of 6424 results
  1. Web-based Intelligent Extraction of Symbology based on Contextual Information

    SBC: Physical Optics Corporation            Topic: HSB0112006

    To address the DHS need for intelligent symbology technologies, Physical Optics Corporation (POC) proposes to continue the development of Web-based Intelligent Symbology Extraction based on Context (WISEC), a unique enterprise symbology system that integrates state-of-the-art natural language processing (NLP) tools with our syntactic event attribute extraction and contextual event coreference algo ...

    SBIR Phase II 2012 Department of Homeland Security
  2. GeoRad-Next Generation High Resolution, Long Range, Flexible and Modular Ground Penetrating Radar

    SBC: Intelligent Automation, Inc.            Topic: 122FH5

    Intelligent Automation Inc (IAI) in collaboration with IDS North America proposes to develop the next generation Ground Penetration Radar (GPR) technology called GeoRad. We will leverage an existing state –of-the-art dual-frequency dual-polarized massive array GPR and improve its accuracy so that wires, and pipes can be mapped. The accuracy of the position of the ground penetration radar directl ...

    SBIR Phase I 2012 Department of Transportation
  3. ElectroDynamic Shield for Prevention of Optical Surface Contamination

    SBC: Poly Adaptive LLC            Topic: 122FR2

    The Federal Railroad Administration’s (FRA) Automated Track Inspection Program uses optical systems such as cameras or laser-based systems to monitor rail performance throughout the country. These systems are hindered by adverse weather conditions that allow water, dirt and mud to coat their optical components resulting in unwanted maintenance costs. Thus FRA is seeking a low-cost, practical s ...

    SBIR Phase I 2012 Department of Transportation
  4. SmartWorkZone- Situational awareness messages in the vehicle when driving through a work zone area.

    SBC: Savari Inc.            Topic: 122FH1

    Congestion due to a work zone can cause accidents, as the drivers may not be prepared to take sudden actions ahead of a work zone or in some cases may not have enough visibility/time. Transmitting alert messages in advance can enable the driver to take safety precautionary measures so that it is beneficial to both the driver and the work zone personnel. The proposal aims to develop a scalable sol ...

    SBIR Phase I 2012 Department of Transportation
  5. Creating Spatial Disorientation in Flight Simulation

    SBC: Systems Technology, Inc.            Topic: 122FA1

    Loss of control associated with an inability of pilots to recover from upsets and unusual attitudes is the leading cause of world-wide commercial jet accidents. A key component in many of these events is pilot spatial disorientation. Improved pilot training in these abnormal flight conditions, including the ability of training simulators to replicate spatial disorientation, is needed to reduce l ...

    SBIR Phase I 2012 Department of Transportation
  6. SCAP Content Editor

    SBC: G2, INC.            Topic: N/A

    NIST and G2 have been on the forefront of security automation with the development of the Security Content Automation Protocol (SCAP). However, the barrier to entry for SCAP content creation is the requirement to have in depth knowledge of the underlying specifications. This project aims to allow security experts to create SCAP content without the need to be an expert in the specification. By leve ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  7. Production Methods and Software for NIST Calibration Phantoms

    SBC: SIGMA K CORP            Topic: N/A

    Magnetic Resonance Imaging data needs to be calibrated using a universal standard. NIST and the ISMRM SQRM committee have developed the NIST/NIST MR phantom. The group had two phantoms manufactured to their specifications and these phantoms have been imaged at numerous imaging facilities. Sigma-K now proposes to develop a complete manufacturing method that will produce 50 MRI phantoms. These phant ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  8. Anion Exchange Resin for Chirality-based Separation of Single-wall Carbon Nanotubes

    SBC: Sepax Technologies, Inc.            Topic: N/A

    Sepax Technologies, Inc. has identified a new type of anoin-exchange resin which separates single-wall carbon nanotubes (SWCNTs) with >80% recovery yield and resolves in a single pass the chiral tubes of (6,5) well from commercial SWCNT starting materials by Chromatography. Improvement and scale up of the targeted resin production will facilitate the separation of chiral nanotubes for the academic ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  9. Irradiated Environmental Chambers

    SBC: MEASUREMENT ANALYSIS CORPORATION            Topic: N/A

    Using a novel concept for humidity control, based on a proprietary saturated air source, MAC will construct and evaluate a prototype of an environmental chamber for use with NIST’s SPHERE UV source, in weathering or other UV degradation studies. The chamber will interface to the exit ports of the SPHERE, maintaining the material coupons, mounted in a standardized sample holder, at a programmed t ...

    SBIR Phase II 2012 Department of CommerceNational Institute of Standards and Technology
  10. Real Time Signal State Transition Software for ATC- NTCIP Interface

    SBC: Advanced Technologies, Inc            Topic: 06FH1

    Phase II Project Scope: ATI has developed an open source Signal Control Programming Environment (SCOPE) that ➢ Implements Actuated Control with Min Recall Mode, Max Recall Mode, Gap Out Mode, Max Out Mode, Presence Mode, Lane-by-Lane Control. ➢ Contains a Pretimed Mode allowing control of 3-leg, 4-leg, and Texas Diamond Intersections ➢ Can be easily ported to any operating system. ➢ Can ha ...

    SBIR Phase II 2012 Department of Transportation
US Flag An Official Website of the United States Government