You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of GD DTPA Bisglucosamide for MRI Contrast

    SBC: Magnetic Research, Inc.            Topic: N/A

    Magnetic resonance imaging (MRI) is a powerful tool for the diagnosis of a broad range of clinicalconditions. Expensive contrast media (about $110.00/dose) contribute to its high cost. We will performthe preliminary steps necessary for a pre-IND evaluation by the FDA of a new inexpensive agent,Gadolinium DTPA Bisglucosamide. Preliminary investigations show lower animal toxicity, improvedgadolinium ...

    SBIR Phase II 1996 Department of Health and Human Services
  2. Intermediate Temperature (~650 Degrees Celsius), High Power Density Solid Oxide

    SBC: Materials and Systems Research, Inc.            Topic: N/A

    41046 Materials and Systems Research, Inc. Generation of electrical energy by fuel cells is an important are of energy conversion technology. The principal impediment to achieving high power densities is the lack of efficient electrodes. The objective of this project is to further enhance the performance of the already efficient electrodes by the introduction of a thin catalytic layer so that t ...

    SBIR Phase I 1996 Department of Energy
  3. VENTRICULAR ASSIST DEVICE

    SBC: MEDQUEST PRODUCTS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  4. An Innovative Microwave Applicator for Paint Stripping

    SBC: MJR Scientific            Topic: N/A

    An effective removal of paint from many surfaces can result in increased safety and reduced maintenance cost for many systems. The ideal paint stripping system should; 1) easily strip paint from various structures, 2) allow safe operation and safe removal of paint hazardous by-products (e.g. lead paint dust), 3) not damage the surface, and 4) by simple and reliable for manual and automated operati ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. Filterless Heat exchanger precleaner based on guide vane approach

    SBC: MJR Scientific            Topic: N/A

    The efficiency, maintenance cost, and service life of off-highway vehicles can be drastically improved with the development of a heat exchanger precleaner. Development challenges include ease of integration with present and new vehicles, the device compact size, high contaminates removal efficiency, low initial and maintenance cost, and high reliability. The objective of Phase I of this project is ...

    SBIR Phase II 1996 Department of DefenseArmy
  6. A LOW POWER, HIGH INTENSITY X-RAY POINT SOURCE

    SBC: Moxtek, Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  7. DIGITAL PROCESSING AND MEASUREMENT OF FACIAL ACTIONS

    SBC: Network Information Research            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Health and Human Services
  8. Thermally Stable Polycrystalline Diamond Cutters for Hard Rock Drilling

    SBC: NOVATEK            Topic: N/A

    41354 November 20, 1996 Novatek Shear bits, also known as drag bits or fixed cutter bits, drill rock substantially faster than roller-cone bits. At present their use is limited to soft and medium formations. It would be highly desirable to expand their use into hard rock, both for drilling of oil and gas and for geothermal applications. A new type of hea ...

    SBIR Phase I 1996 Department of Energy
  9. Development and Testing of a Down-hole Mud Actuated Hammer

    SBC: NOVATEK            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  10. Development and Testing of a Jet Assisted Polycrystalline Diamond Drilling Bit

    SBC: NOVATEK            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government