You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. INNOVATIVE MEMBRANE TECHNOLOGY FOR DIRECT DISSOLUTION OF GASES TO ENHANCE IN SITU BIOREMEDIATION OF GROUNDWATER

    SBC: Membran Corp.            Topic: N/A

    THE USE OF GASEOUS MICROBIAL SUBSTRATES SUCH AS OXYGEN, METHANE, AND HYDROGEN HAS THE POTENTIAL OF ACCELERATING THE IN SITU BIOREMEDIATION OF GROUNDWATER CONTAMINATED WITH PETROLEUM HYDROCARBONS OR CHLORINATED SOLVENTS. THE ONE FACTOR THAT MAY LIMIT THE FEASIBILITY OF USING GASEOUS SUBSTRATES IS THE RATE AT WHICH THE SLIGHTLY SOLUBLE GASES CAN BE DISSOLVED IN WATER. THE USE OF SPARGING TO DISSOLVE ...

    SBIR Phase I 1992 Environmental Protection Agency
  2. MAXIMIZING SHOOT FORMING EFFICIENCY OF POPULUS USING IN VITRO MICRO-CROSS SECTIONS

    SBC: Minn Vitro Inc.            Topic: N/A

    MICRO-CROSS SECTION (MCS) IS A NEW METHOD FOR MICROPROPAGATION (TISSUE CULTURE) OF SELECTED PLANTS WHICH SHOULD SIMULTANEOUSLY PROVIDE A DRAMATIC PER UNIT COST REDUCTION AND A LARGE INCREASE IN PLANT AVAILABILITY. BECAUSE OF A PROJECTED SEVERE SHORTFALL OF NATURALLY OCCURRING ASPEN FOR WOOD PRODUCTS INDUSTRIES WE HAVE SELECTED 2 ASPEN AND 4 HYBRID ASPEN GENOTYPES TO USE IN THE EVALUATION OF THIS T ...

    SBIR Phase II 1992 Department of Agriculture
  3. FEASIBILITY STUDY FOR THE DEVELOPMENT OF A WATER COLLECTION SYSTEM FOR FLOATING NET PEN AQUACULTURE

    SBC: Minnesota Aquafarms Inc            Topic: N/A

    A SMALL SCALE WASTE COLLECTION SYSTEM WILL BE DESIGNED AND EVALUATED TO DETERMINE POTENTIAL EFFECTIVENESS OF FOUR DIFFERENT DEGREES OF CONTAINMENT OF NET PANS; 5, 50, 60, AND100 PERCENTS. EFFECTIVENESS OF THE COLLECTION UNIT WILL BE EVALUATED BY MONITORING EFFICIENCY OF PHOSPHOROUS, SUSPENDED SOLIDS AND DOB LOAD REMOVAL AT EACH OF THE FOUR CONFIGURATIONS. OTHER OPERATIONAL AND ENVIRONMENTAL PROBLE ...

    SBIR Phase I 1992 Department of Commerce
  4. DEVELOPMENT OF MEMBRANE SAMPLING SYSTEM TO CONCENTRATE TOXIC ENVIRONMENTAL COMPOUNDS FOR RAMAN SPECTROSCOPY ANALYSIS

    SBC: NeoMecs Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
  5. NOVEL SURFACES BY PLASMA TECHNIQUE FOR DNA DETECTION

    SBC: NeoMecs Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Health and Human Services
  6. Controlled Anti-Ferromagnetic Coupling in Giant Magnetoresistance Materials

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseMissile Defense Agency
  7. Nanometer Magnetoresistive Random Access Memory

    SBC: NVE CORP. (FORMERLY NONVOLATILE ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseMissile Defense Agency
  8. INTEGRATION OF FOREST GROWTH AND YIELD PREDICTION WITH FOREST INVENTORY SYSTEMS

    SBC: Pro-west And Associates            Topic: N/A

    NUMEROUS LAND MANAGERS REQUIRE ACCURATE AND TIMELY INFORMATION ON LOCAL AND REGIONAL FOREST RESOURCE SUPPLY. HISTORICALLY, LITTLE WORK HAS BEEN FOCUSED ON THE DEVELOPMENT OF FOREST GROWTH AND YIELD MODELS WHICH CAN BE BOTH DEVELOPED AND IMPLEMENTED FORM EXISTING INVENTORY DATA. FURTHER, EFFORTS TO INTEGRATE THE MODELS INTO THE DATA BASE MANAGEMENT SYSTEMS OF LOCAL PUBLIC AGENCIES HAVE BEEN WEAK AN ...

    SBIR Phase II 1992 Department of Agriculture
  9. Methodology for Assuring Trusted Software

    SBC: SECURE COMPUTING CORP.            Topic: N/A

    The goal of this project is to develop a methodology and supporting tools for automating much of the difficult task of showing that the source code for a large software system correctly implements its critical requirements. A module level specification format and two tools, a module level flowtool and a code summary tool, will be developed. The approach supplements the software development tasks o ...

    SBIR Phase I 1992 Department of DefenseMissile Defense Agency
  10. A SEMI-AUTOMATED DOWNGRADER FOR MLS NETWORK GUARDS

    SBC: SECURE COMPUTING CORP.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of DefenseAir Force
US Flag An Official Website of the United States Government