You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
High Current Density High Repetition Rate Ferroelectric Cathode
SBC: Fm Technologies Inc Topic: N/A150 High Current Density High Repetition Rate Ferroelectric Cathode--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. L.K. Len, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82376 Amount: $75,000 Aside from thermionic emission, previous methods of high-current-density electron emission for charged-particle ac ...
SBIR Phase I 1997 Department of Energy -
High Current Diamond Microtip Cathode
SBC: Systems & Processes Engineering Corporation Topic: N/A155 High Current Diamond Microtip Cathode--Systems & Processes Engineering Corporation (SPEC), 401 Camp Craft Road, Austin, TX 78746-6558; (512) 306-1100 Dr. Keith D. Jamison, Principal Investigator Ms. Diane Joyce, Business Official DOE Grant No. DE-FG03-97ER82493 Amount: $75,000 There exists a continuing need for high current, field emission electron sources (i.e., cold cathodes) for use in ...
SBIR Phase I 1997 Department of Energy -
High-Flux, Low Energy, Ion Source for High Rate Ion-Assisted Deposition of Hard Coatings
SBC: Plasmaquest, Inc. Topic: N/A45 High-Flux, Low Energy, Ion Source for High Rate Ion-Assisted Deposition of Hard Coatings--PlasmaQuest, Inc., 850 North Dorothy Drive, Suite 504, Richardson, TX 75081-2769; (972) 680-1811 Dr. Chris Doughty, Principal Investigator Dr. John E. Spencer, Business Official DOE Grant No. DE-FG03-97ER82459 Amount: $75,000 Hard coatings have many applications in the transportation, manufacturing an ...
SBIR Phase I 1997 Department of Energy -
Highly Branched, Lightly Crosslinked, Solid Polymer Electrolytes
SBC: TPL, Inc. Topic: N/A40690 TPL, Inc. This project will develop a novel solid polymer electrolyte (SPE) that will significantly increase the practical power and energy density of state-of-the-art secondary lithium batteries. The approach will yield carbosilane-based electrolytes with high conductivities and low transference numbers. Covalently attaching thin films of these novel electrolytes to high energy density c ...
SBIR Phase I 1996 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
HIGH-POWER TRANSVERSE-MODULATION MICROWAVE GENERATOR WITH AXIAL-FIELD CONFINEMENT
SBC: Fm Technologies Inc Topic: N/AN/A
SBIR Phase I 1990 Department of Energy -
High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling
SBC: Kalsi Engineering, Incorporated Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
IMPROVED ENHANCED OIL RECOVERY PROCESSES USING NEW AND NOVEL SYNTHETIC COPOLYMERS CONTAINING LARGE AMOUNTS OF ACRYLAMIDE
SBC: R. L. Clampitt And Topic: N/AINDEPENDENTS IN THE MID-CONTINENT AREA INCLUDING OKLAHOMA AND KANSAS, NEED A NEW AND NOVEL WATER SOLUBLE POLYMER FOR INDEPTH MOBILITY CONTROL IN ENHANCED OIL RECOVERY (EOR) PROCESSES AT INTERMEDIATE TEMPERATURES OF 165 TO 200 FAHRENHEIT. PARTIALLY HYDROLYZED POLYACRYLAMIDES AND NATURAL POLYMERS HAVE HISTORICALLY BEEN THE PRODUCTS USED IN THIS REGION. AND IN ESSENTIALLY ALL OF THE EARLIER EOR PROJE ...
SBIR Phase I 1990 Department of Energy -
IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS
SBC: Kalsi Engineering, Incorporated Topic: N/AMOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
INLET-PRECHARGED LIMESTONE EMISSION CONTROL (LEC) PROJECT
SBC: ETHERWARE, LLC Topic: N/AMANY UTILITY AND INDUSTRY COAL-FIRED BOILERS HAVE ELECTROSTATIC PRECIPITATORS (ESPS) ALONE, WHICH ARE NOT CAPABLE OF REMOVING SO2. MANY OLDER ESPS WILL REQUIRE UPGRADING IN THE 1990S TO MEET MORE STRINGENT PARTICULATE STANDARDS. ETS, INC. HAS TESTED ITS PATENTED LIMESTONE EMISSION CONTROL (LEC) SYSTEM, DEMONSTRATING GREATER THAN 90% SO2 REMOVAL CAPABILITY. LECS CAN BE PLACED DOWNSTREAM OF ESPS. IT ...
SBIR Phase I 1990 Department of Energy