You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A POSITION CONTROL SYSTEM OF AN INTEGRAL FAST REMOTE HANDLING SYSTEM USING OMNIDIRECTIONAL VIEWING

    SBC: Telerobotics International,            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Energy
  2. AN EVALUATION WILL BE MADE TO DETERMINE THE FEASIBILITY OF AND METHODS FOR APPLYING INDUSTRIAL ROBOTIC COMPONENTS TO PERFORM FUSION REACTOR INSPECTION AND MAINTENANCE WORK.

    SBC: Remotec Inc.            Topic: N/A

    AN EVALUATION WILL BE MADE TO DETERMINE THE FEASIBILITY OF AND METHODS FOR APPLYING INDUSTRIAL ROBOTIC COMPONENTS TO PERFORM FUSION REACTOR INSPECTION AND MAINTENANCE WORK. THE OBJECTIVE IS TO DECREASE BOTH THE RADIOLOGICAL HAZARDS TO WORKERS AND THE PLANT OUTAGE TIME REQUIRED FOR PERFORMING THE WORK. INCLUDED WILL BE A CHARACTERIZATION OF THE WORK TASKS, SELECTION OF ROBOTIC COMPONENTS AND AN EVA ...

    SBIR Phase I 1984 Department of Energy
  3. AN INVESTIGATION AND DEVELOPMENT OF THE COLLECTIVE INTERACTION KLYSTRON

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  4. A FEASIBILITY STUDY FOR A SEISMIC EARLY WARNING SYSTEM FOR NUCLEAR POWER PLANT SHUTDOWN

    SBC: ENSCO Inc            Topic: N/A

    A FEASIBILITY STUDY WILL BE CONDUCTED OF A SEISMIC SCRAM-PROCESSING SYSTEM IN WHICH P WAVES FROM LARGE EARTHQUAKES ARE DETECTED AND ANALYZED IN TIME TO INITIATE A NUCLEAR POWER PLANT CORE SHUTDOWN BEFORE THE ARRIVAL OF LARGE, DAMAGING SHEAR WAVE PHASES. A PROTOTYPE SEISMIC SCRAM-MONITORING SYSTEM WILL BE DESIGNED AND IMPLEMENTED ON A SUN 3/160 ENGINEERING WORKSTATION. IN THE PROPOSED SYSTEM, SEISM ...

    SBIR Phase I 1987 Department of Energy
  5. URANIUM HEXAFLUORIDE IS THE WORKING FLUID IN THE GAS CENTRIFUGE.

    SBC: Comstock Inc            Topic: N/A

    URANIUM HEXAFLUORIDE IS THE WORKING FLUID IN THE GAS CENTRIFUGE. A NEED EXISTS FOR UF6 ASSAY DETERMINATION IN A FULLY AUTOMATED SYSTEM IN REAL-TIME. THIS PROJECT ADDRESSES THE CONCEPTUAL DEVELOPMENT OF A NEW ION TRAP TIME-OF-FLIGHT METHOD FOR MONITORING THE RELATIVE PROPORTIONS OF CLOSELY SPACED ION MASSES. IT IS DIRECTLY APPLICABLE TO THE ASSAY OF U235/U238 RATIOS IN THE UF6 GAS STREAM IN REAL-TI ...

    SBIR Phase I 1984 Department of Energy
  6. INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING.

    SBC: Salvonics Inc.            Topic: N/A

    INSTRUMENTS BASED ON THE SEEBECK EFFECT HAVE BEEN USED SUCCESSFULLY IN EUROPE AND THE UNITED STATES TO IDENTIFY ALLOYS THAT HAVE BEEN HARDENED BY HEAT TREATMENT OR COLD WORKING. BECAUSE THE RESULTS OF RADIATION DAMAGE, INCREASED YIELD STRENGTH AND DECREASED TOUGHNESS ARE SIMILAR, AN INVESTIGATION IS PROPOSED TO EXAMINE THE FEASIBILITY OF USING THE SEEBECK EFFECT IN THE ASSESSMENT OF RADIATION DAMA ...

    SBIR Phase I 1984 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government