You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. RELIABLE OBJECT BASED ARCHITECTURE FOR INTELLIGENT CONTROLLERS (ROCS)

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    RELIABLE OBJECT-BASED CONTROL SOFTWARE (ROCS) ISA PROGRAMMING TECHNOLOGY THAT CAN BE COMBINED WITH BOTH INDUSTRIAL PROGRAMMABLE CONTROLLERS AND POWERFUL RISC BASED PROCESSORS TO CONSTRUCTFLEXIBLE CONTROL COMPONENTS OF GENERAL PURPOSE MACHINE TOOLS. ROCS ALSO SUPPORTS THE COMBINATION OF THOSE COMPONENTS INTO INNOVATIVE STATION, CELL, CENTER OR FACTORY AUTOMATION CONCEPTS. THE PROPOSED TECHNOLOGY WO ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  2. A KNOWLEDGE-BASED AUTOMATED PROCESS PLANNING SYSTEM (KAPPS) WITH ASSUMPTION-BASED TRUTH MAINTENANCE SYSTEM AND GEOMETRIC

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  3. Model Neutral Data Representation Using the Theory of Corobs

    SBC: LAWRENCE TECHNOLOGIES, LLC            Topic: N/A

    We propose to demonstrate a powerful, general approach, the Theory of Corobs, to address DARPA's identified need for canonical data structure and access mechanisms to support model interoperability. The technology we will produce under this contract will enable the construction of robust data warehousing supporting a wide range of "looks" of the data to the outside world, true generic knowledge b ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  4. Multi-Media Collaboration: Share, A Multi-Media Information-Object Collaboration Tool and Efficiency Metrics Concerning Desktop Collab...

    SBC: Lb&m Assoc., Inc.            Topic: N/A

    DARPA has identified collaborative computing as a technology not yet adequately developed in the marketplace. This need to share and interactively work with documents and other information objects across separate computer systems is really the underlying human business need that originally drove the creation of network technology, desktop video-teleconferencing, and even the failed earlier indust ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  5. Terrain and Geologic Feature Extraction from Synthetic Aperture Radar (SAR) Imagery

    SBC: Leighty & Associates, Inc.            Topic: N/A

    The primary objective of this effort is to develop tractable techniques to automatically extract terrain and geologic features from interferometric SAR (IFSAR) imagery and Digital Terrain Elevation (DTE) data produced from IFSAR phase data. A secondary objective is to develop performance prediction techniques for the extraction process. Today terrain information extraction from aerial imagery rema ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  6. Virtual Environmental Training for Battlefield Medical Personnel

    SBC: LINCOM CORP.            Topic: N/A

    The Virtual Environment Training for Battlefield Medical Personnel (VETBMP) project is the development of a simulation architecture designed to integrate procedural simulations, intelligent tutoring, and various sensory input devices to create a realistic training scenario for 'forward' military personnel. Phase I of VETBMP will be a simulation of a standard medic task (intravenous infusion), emb ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  7. EVALUATION METHODS AND METRICS FOR IMAGE PROCESSING AND UNDERSTANDING SYSTEMS

    SBC: LYNNE GILFILLAN ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  8. High Performance Robust Lightweight Proton Exchange Membrane Fuel Cell

    SBC: LYNNTECH INC.            Topic: N/A

    At present, the only fuel cell systems that have the capability of achieving high power den W cm-2) are the proton exchange membrane (PEM) and the alkaline fuel cell (AFC) systems. Of these, the PEM system is the leading candidate fuel cell power source for many military and commercial applications. In order to make PEM fuel cell power sources cost-competitive with competing technologies and more ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  9. Improved Structural Adhesives from Natural Products for High-Moisture Environments

    SBC: LYNNTECH INC.            Topic: N/A

    At present, four classes of structural adhesives (epoxy resins, phenolic resins, acrylic adhesives and urethanes) are commonly employed in applications where the adhesive joint is either totally immersed in salt or fresh water or subject to high levels of moisture while simultaneously experiencing large shear loads. Each of these synthetic polymer formulations suffers from individual disadvantages ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  10. Electrochemical Recovery of Heavy Metals from Ground Water at Military Sites

    SBC: LYNNTECH INC.            Topic: N/A

    The Department of Defense has undertaken an ambitious environmental restoration program at thousands of facilities in the U.S. Many of these facilities have been contaminated by the discharge of dissolved heavy metals. Often these contaminants migrate into the ground water where they pose a serious threat to aquatic systems and to human health. The remediation of soils and ground water is usual ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government