You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Techniques for Arena Testing & Image Motion Modeling/Reconstruction

    SBC: OBSERVERA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  2. A Software Environment for Developing Large-Scale Knowledge Bases

    SBC: ONYX CONSULTING, INC.            Topic: N/A

    Knowledge based methods have the potential to offer high performance solutions to a wide variety of problems. However, the development of large scale knowledge bases (KBs) and their effective application to problems have so far proved to be more expensive and less feasible than other competing methods such as statistical methods or weak search techniques. There is an immediate and critical need to ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. Portable Auditory Diagnostic System

    SBC: Paradigm Group Management Dba            Topic: N/A

    DIAGNOSTx Technologies proposes to develop a PC-based instrument for the clinical evaluation of peripheral and central hearing deficits, which will allow audiometric, otoacoustic emissions, evoked-potentials and immittance testing. The integrated system will be capable of assessing hearing sensitivity for speech and pure tones, of evaluating the integrity outer hair cells and auditory central ner ...

    SBIR Phase I 1997 Department of DefenseAir Force
  4. Advanced Audio and Virtual Human Sensory Interfaces: Improved Algorithm for Controlling Distance in 3-D Audio Displays

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    The project goal is to produce an algorithm for synthesizing auditory distance which will be accurately perceived with little or no learning required. The algorithm could be added to an existing AF 30D audio system which uses headphones in a noise-reducing helmet. The approach is to combine very accurate recently developed atmospheric modeling with head-related transfer functions (HR ...

    SBIR Phase I 1996 Department of DefenseAir Force
  5. Economical and Reliable Adaptive Disturbance Cancellation for Lightly Damped Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Efforts to apply active noise and vibration control commercially, while intensifying, continue to be hampered by the cost of the computers required to implement the active algorithms. Currently, the cost of wide-band control is prohibitive for lightly damped systems such as precision structures or highly reverberant acoustic spaces, even if the system has just one canceling actuator and one error ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. Wind Noise Reduction Using the Multiple Aperture Sensor System

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Wind noise in outdoor measuemetn micropnones can mask an acoustic signal. Windscreens provide some wind noise reduction; however, those typically used for outdoor applications provide noise reductions of approximately 10-15 dB. Planning Systems Incorporated (PSI) proposes to design and test a Multiple Aperture Sensor System (MASS) consisting of a microphone, a processor, and data acquisitio and ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. A Job Performance Measurement System

    SBC: Research Development Corporation            Topic: N/A

    As organizations move toward increased performance measurement and accountability, there is an increasing need to measure job performance at the individual worker level. Traditional assessment tools have been criticized as measuring test taking skills more than job performance skills. A number of approaches have been developed to address this weakness by measuring performance in practical proble ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. ION BEAM PROCESSING ZNSE

    SBC: Sandia Systems, Inc.            Topic: N/A

    ION BEAMS WILL BE APPLIED IN SEVERAL ASPECTS OF PROCESSING ZNSE OPTICAL COMPONENTS. FIRST THE MATERIAL WILL BE MILLED, AND THEN IT WILL BE COATED USING ION ASSISTED DEPOSITION TECHNIQUES. REDUCED SCATTER FROM THE SUBSTRATE AND IMPROVE OPTICAL AND MECHANICAL PROPERTIES OF THE FILM ARE ANTICIPATED.

    SBIR Phase I 1990 Department of DefenseAir Force
  9. Inductive Vehicle Identification System

    SBC: SCENTCZAR CORP.            Topic: N/A

    Project will develop an inexpensive vehicle identification system capable of identifying vehicles at speeds from 0 to 85 miles per hour using a conventional inductive loop or an overhead reader. System will have the following characteristics: 1) compatible with existing vehicle detector inductive loops already installed at many facilities minimizing implementation costs, 2) utilize low frequency ...

    SBIR Phase I 1997 Department of DefenseAir Force
  10. The Development of a Fieldable Laser Diode Wound Stabilization System

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    With the development of compact, rugged laser diodes that can be powered with bateries, it appears that medical procedures that utilize lasers can now be brought into the field environment. The goal of this effort is to develop a fieldable laser diode tissue soldering system for wound stabilization. In this technique, a laser is used to thermally cure a protein solution placed onto a wound. Thi ...

    SBIR Phase I 1997 Department of DefenseAir Force
US Flag An Official Website of the United States Government