You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LOW WORK FUNCTION CATHODE MATERIALS FOR HIGH PERFORMANCE ARC-JET AND ION THRUSTERS

    SBC: HI-Z TECHNOLOGY, INC.            Topic: N/A

    THE WORK FUNCTION IS THE ENERGY NEEDED TO REMOVE AN ELECTRON FROM A METAL SURFACE, SUCH AS IN THERMIONIC EMISSION. A LOWER WORK FUNCTION ALLOWS THE EMITTING SURFACE TO OPERATE AT A MUCH REDUCED TEMPERATURE FOR THE SAME CURRENT. LOW WORK FUNCTION SINGLE PHASE MATERIALS WITH REFRACTORY PROPERTIES ALLOW CATHODES TO OPERATE AT A LOWER TEMPERATURE AND SHOULD PERMIT LONGER LIFETIMES AT TEMPERATURES OF > ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  2. ADVANCED MANDREL FOR FABRICATION OF FILAMENTARY COMPOSITE STRUCTURES

    SBC: Holli Research            Topic: N/A

    HOLLI RESEARCH'S CMIS MANDREL SYSTEM WILL MAKE BETTER MANDRELS FOR MEDIUM TO LARGE FILAMENTARY ADVANCED COMPOSITE STRUCTURES. WITH CURRENT TECHNOLOGY, THE MANDRELS USED TO FABRICATE COMPOSITE PARTS WEIGH 20 TIMES MORE THEN THE FINISHED PART. THIS, IN TURN, CAUSES FABRICATION, DIMENSIONAL, AND HANDLING PROBLEMS. FURTHERMORE, THESE EXISTING MANDREL SYSTEMS HAVE HIGH RECURRING EXPENSES, ADDING TO THE ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  3. PIEZOELECTRIC ACTUATOR SHEET AS A LOW-COST DEFORMABLE MIRROR

    SBC: Industrial Sensors & Actuators            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  4. ELECTRON-BEAM CONTROLLED SEMICONDUCTOR SWITCH

    SBC: Integrated Applied Physics,            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  5. FAULT-TOLERANT WAFER SCALE INTEGRATION

    SBC: Irvine Sensors Corporation            Topic: N/A

    THIS PROGRAM REPLACES THE CONVENTIONAL PASSIVE INTERCONNECT SUBSTRATE USED IN MULTI-CHIP MODULES WITH AN ACTIVE SILICON SUBSTRATE. THIS APPLICATION USES THE ACTIVE SUBSTRATE (ASIC) TO IMPLEMENT A FAULT TOLERANT MEMORY SYSTEM. THE SUBSTRATE PROVIDES EDAC, AUTOMATIC SEU SCRUBBING, MEMORY MAPPING AND RECONFIGURATION, SPARES MANAGEMENT, SYSTEM I/O POWER CONTROL AND SELF TEST TO A 3-D STACKED MEMORY MO ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  6. INITIAL DESIGN DEVELOPMENT AND SPECIFICATIONS FOR THE TOURS SYSTEM

    SBC: Irvine Sensors Corporation            Topic: N/A

    N/A

    SBIR Phase II 1991 Department of DefenseMissile Defense Agency
  7. INTEGRATED BEAM-STEERING MODULE

    SBC: Laser Systems & Research            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  8. PROGRAMMABLE, PARTICLE SIZING SENSOR

    SBC: METROLASER, INCORPORATED            Topic: N/A

    PARTICLE CONTAMINAMTS AFFEST THE PERFORMANCE OF SPACE PLATFORMS. THESE PARTICLES ARE EXPECTED TO RANGE BETWEEN 0.5UM AND 10UM IN DIAMETER AND THEIR CONCENTRATION AND COMPOSITION MAY BE DIVERSE AND UNKNOWN. A PARTICLE SIZING INSTRUMENT IS BEING DEVELOPED TO DETERMINE THE SIZE AND SPACE DISTRIBUTION OF THIS ILL-DEFINED PARTICLE CLOUD. A 45 MW DIODE LASER IS USED TO MAKE A LIGHT WEIGHT INSTRUMENT WHI ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  9. OPTIMISTIC SCHEDULING OF NON-NUMERIC TASKS ON HIGHLY PARALLEL PROCESSOR ARCHITECTURES

    SBC: Nimble Computer Corp.            Topic: N/A

    OBJECTIVE: TO DEVELOP IMPROVED TECHNIQUES AND ALGORITHMS FOR THE OPTIMISTIC EXECUTION OF LARGE-SCALE SYMBOLIC COMPUTATIONS ON HIGHLY PARALLEL MULTIPROCESSORS. PHASE I WILL EXPLORE THE FEASIBILITY OF AUTOMATICALLY SCHEDULING MANDATORY AND SPECULATIVE TASKS USING INFORMATION GAINED FROM BOTH COMPILE-TIME AND CONCURRENT RUN-TIME STRICTNESS ANALYSES, WHICH PERFORM CONCURRENT MEANS-END ANALYSES ON TASK ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  10. WIDE APERTURE, HIGH ANGULAR AND ENERGY RESOLUTION IMAGING GAMMA RAY DETECTOR

    SBC: NOVA R&D, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government