You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ENERGY REDUCTION IN BALL MILL GRINDING

    SBC: Mountain States Analytical            Topic: N/A

    COMMINUTION OF MINERALS BY BALL MILLING IS ENERGY INTENSIVE. ENERGY EFFICIENCY OF BALL MILLING RANGES FROM LESS THAN 1 PERCENT TO 10 PERCENT. BREAKAGE BY CRUSHING IS HIGHER IN EFFICIENCY BUT IS IMPRACTICAL FOR PRODUCTION OF A FINE MESHED PRODUCT. IT HAS BEEN ESTABLISHED IN LABORATORY TESTS THAT HIGH VELOCITY IMPACT BREAKAGE OF PARTICLES RESULTS IN COMPLETE BREAKAGE WHEREAS LOW VELOCITY IMPACTS ...

    SBIR Phase I 1994 Department of Energy
  2. A MULTIMEDIA-AUGMENTED SOFTWARE TUTORIAL FOR THE HIGH ACCEPTANCE RECOIL POLARIMETER DEVICE

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS PROJECT WILL ASSESS THE FEASIBILITY OF USING MULTIMEDIA-AUGMENTED SOFWEARE TUTORIALS TO SUPPORT TEACHING THE PRINCIPLES OF EXPERIMENTAL NUCLEAR PHYSICS. THE DETECTOR SYSTEM FOR THE PHOTON TAGGING FACILITY AT THE CONTINUOUS ELECTRON BEAM ACCELERATOR FACILITY (CEBAF) IN NEWPORT NEWS, VIRGINIA IS NOW UNDER CONSTRUCTION AT THE NUCLEAR DETECTOR LABORATORY OF THE CENTER FOR NUCLEAR STUDIES OF THE ...

    SBIR Phase I 1994 Department of Energy
  3. A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS

    SBC: Radiation Safety Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. AN INTELLIGENT TUTORING GAME TO TEACH SCIENTIFIC REASONING

    SBC: Research Development Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  5. HIGH QUALITY CHEMICALLY VAPOR DEPOSITED NIOBIUM COATINGS FOR SUPERCONDUCTING RADIO FREQUENCY CAVITIES

    SBC: Sumi Tech, Inc.            Topic: N/A

    TRADITIONALLY, SUPE2RCONDUCTING CAVITIES FOR LARGE ELECTRON POSITION COLLIDERS ARE FABRICATED FROM HIGH PURITY NIOBIUM (NB) SHEETS USING LATHE SPINNING AND WELDING. THESE CAVITIES SUFFER FROM THE PROBLEM OF THERMOMAGNETIC BREAKDOWN RESULTING FROM THE RELATIVELY POOR THERMAL CONDUCTIVITY OF NB AT LIQUID HELIUM TEMPERATURES. A MORE ELEGANT AND LOW COST SOLUTION TO THE BREAKDOWN PROBLEMS IS THE USE ...

    SBIR Phase I 1994 Department of Energy
  6. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. SURFACE HARDENING OF POLYMERIC COMPOSITES BY HIGH ENERGY ION IRRADIATION

    SBC: UES INC            Topic: N/A

    THE RECENT MAJOR ADVANCES IN SURFACE HARDENING OF POLYMERS BY ION IRRADIATION OPENED UP THE OPPORTUNITY FOR REPLACING MANY CURRENT PARTS IN THE AUTOMOTIVE INDUSTRY. THERE ARE MANY GEAR APPLICATIONS WHERE THE USE OF POLYMERS IS DESIRABLE FROM THE STANDPOINT OF NOISE, COST, AND/OR WEIGHT REDUCTION. HOWEVER, POLYMERS TEND NOT TO DO WELL IN WEAR AND FRICTION APPLICATIONS BECAUSE OF THEIR LOW HARDNES ...

    SBIR Phase I 1994 Department of Energy
  8. A URANIUM CARBIDE/RHENIUM THERMIONIC FUEL ELEMENT

    SBC: Applied Sciences Inc.            Topic: N/A

    A THERMIONIC FUEL ELEMENT (TFE) BASED ON ADVANCED URANIUM CARBIDE (UC) SOLID SOLUTION FUEL WITH RHENIUM EMITTER CLADDING SHOULD ALLOW MUCH BETTER PERFORMANCE THAN PRESENT DESIGNS. THE FUEL FORM WOULD BE A LONG, THIN, HOLLOW "VERMICELLI" SHAPE TO ALLOW VERY COMPACT REACTORS TO BE DESIGNED, DESPITE THE HIGH NEUTRON ABSORPTION CROSS SECTION OF RHENIUM. RHENIUM IS EXPECTED TO BE COMPLETELY COMPATIBLE ...

    SBIR Phase I 1992 Department of Energy
  9. REFRACTORY METAL COATINGS ON CARBON/CARBON COMPOSITES FOR FIRST WALL APPLICATIONS

    SBC: Applied Sciences Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Energy
  10. FEASIBILITY OF AN ULTRA-CENTRIFUGE FOR DRYING COMMINUTED DEEP CLEANED COAL

    SBC: Coal Tech Corp.            Topic: N/A

    THE DEEP CLEANING PROCESSES NOW UNDER INVESTIGATION FOR COAL MOST OFTEN INVOLVE PULVERIZING AND THE USE OF A LIQUID PROCESS MEDIUM. IF THE VERY FINE DEEP CLEANED COAL IS TO BE USED IN A DRY FORM, A SATISFACTORY DRYING TECHNOLOGY IS VITAL. PREVIOUS STUDIES HAVE INDICATED A SUBSTANTIAL PROBABILITY OF SUCCESS IF THE ULTRAHIGH LEVELS OF CENTRIFUGE GRAVITY ARE COMBINED WITH THE CENTRIFUGAL DECANTING/FI ...

    SBIR Phase I 1992 Department of Energy
US Flag An Official Website of the United States Government