You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ION BEAM PROCESSING ZNSE

    SBC: Sandia Systems, Inc.            Topic: N/A

    ION BEAMS WILL BE APPLIED IN SEVERAL ASPECTS OF PROCESSING ZNSE OPTICAL COMPONENTS. FIRST THE MATERIAL WILL BE MILLED, AND THEN IT WILL BE COATED USING ION ASSISTED DEPOSITION TECHNIQUES. REDUCED SCATTER FROM THE SUBSTRATE AND IMPROVE OPTICAL AND MECHANICAL PROPERTIES OF THE FILM ARE ANTICIPATED.

    SBIR Phase I 1990 Department of DefenseAir Force
  2. MULTI-LEVEL SECURITY SYSTEM FOR AMPHIBIOUS OPERATION COMMAND AND CONTROL

    SBC: Savannah River Associates Inc            Topic: N/A

    SOFTWARE DEVELOPED TO FACILITATE A MULTI-LEVEL SECURITY SYSTEM MUST MEET A VARIETY OF SECURITY AND PERFORMANCE SPECIFICATIONS IN AN OPERATIONAL ENVIRONMENT. WE PROPOSE TO ANALYZE, DESIGN AND DEVELOP A SECURITY SYSTEM FOR THE MARINE CORPS COMMAND AND CONTROL SYSTEM BY EMPLOYING STATE-OF-THE-ART SYSTEM ENGINEERING METHODOLOGIES, TECHNIQUES AND PRINCIPLES. SRA WILL EMPLOY A SYSTEM LIFE CYCLE APPROACH ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. ENGINEERING DEVELOPMENT OF ON-LINE DIAGNOSTIC SYSTEM FOR SIMULTOR PERFORMANCE MONITORING

    SBC: Sbs Engineering, Inc.            Topic: N/A

    THE PERFORMANCE TRANSFER FROM A TRAINING SIMULATOR TO THE OPERATIONAL EQUIPMENT IS DIRECTLY RELATED TO THE FIDELITY OF THE SIMULATOR. SUBTLE CHANGES IN THE RELATIVE DYNAMIC, MOTION AND/OR VISUAL SYSTEM PERFORMANCE CAN BE DETECTED BY THE TRAINEE RESULTING IN ADVERSE PHYSICAL REACTIONS (OFTEN REFERRED TO AS "SIMULATOR SICKNESS"), AND CORRESPONDING DEGRADATION IN THE TRAINING EFFECTIVENESS. THE ADVEN ...

    SBIR Phase I 1990 Department of DefenseNavy
  4. SERAT- SYSTEM ENGINEERING REQUIREMENTS ANALYSIS TECHNIQUE

    SBC: Sci-so Inc            Topic: N/A

    THE SOFTWARE SYSTEM ENGINEERING PROCESS OF CONVERTING CONCEPTS INTO REQUIREMENTS, AND THEN REQUIREMENTS INTO AN IMPLEMENTED SYSTEM IS BECOMING INCREASINGLY COMPLEX. CURRENT METHODS FALL SHORT OF THEIR OBJECTIVES IN HANDLING THIS COMPLEXITY. STRUCTURED FUNCTIONAL ANALYSIS (SFA) LACKS LINKAGE TO DELIVERABLE PRODUCTS - AN END ITEM MUST BE BUILT. ON THE OTHER HAND, THE NEWER OBJECT ORIENTED REQUIREMEN ...

    SBIR Phase I 1990 Department of DefenseNavy
  5. IR BACKGROUND MODELING AND ANALYSIS

    SBC: SENSCI CORP.            Topic: N/A

    THE PROPOSAL ENCOMPASSES THE DEVELOPMENT OF BACKGROUND CLASSIFICATION ALGORITHMS THAT CAN BE USED TO ASSIST A MODEL OPERATOR TO IDENTIFY THE BACKGROUND ELEMENTS FOR AN EXISTING INFRARED SIGNATURE MODEL. WE ALSO PROPOSE TO EXTEND THE MODEL TO THOSE AREAS OF PREDICTION THAT HAVE NOT BEEN DEVELOPED FOR THIS MODEL. ANTICIPATED AREAS OF MODEL EXTENSION IS IN THE PREDICTION OF SEA SIGNATURES AND TARGETS ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. TOTAL QUALITY MANAGEMENT (TQM) CONTROL CRITERIA APPLIED TO LONG TERM TEST PROGRAMS

    SBC: SIGMA SYSTEMS RESEARCH, INC.            Topic: N/A

    THIS PROPOSAL BRINGS TOGETHER, IN A SMALL COMPANY ENVIRONMENT, A COMPREHENSIVE TEAM OF EXPERTS TO DIRECTLY APPLY TOTAL QUALITY MANAGEMENT (TQM) PRINCIPLES TO TOMAHAWK OPERATIONAL TEST LAUNCH (OTL) PROCESSES. IT PROVIDES FOR STRUCTURING TEST PROGRAMS TO IMPROVE TESTING QUALITY, PROVIDE FOR MORE EFFECTIVE RESOURCE UTILIZATION AND INCREASE TEST PROCESS COST EFFECTIVENESS. WE APPLY STRUCTURED ANALYTIC ...

    SBIR Phase I 1990 Department of DefenseNavy
  7. COMMUNICATIONS SIGNAL RECOGNITION AND DEMODULATION VIA NEURAL NETWORKS

    SBC: Signal Analytics Corp            Topic: N/A

    THE GOAL OF THIS PROGRAM IS TO IDENTIFY SPECIFIC NEURAL NETWORK ARCHITECTURES AND ALGORITHMS WHICH ARE APPLICABLE TO COMMUNICATIONS PROBLEMS AND EVALUATE THOSE ARCHITECTURES AND ALGORITHMS VIA SIMULATION AND MODELING. WE DEFINE HEREIN A SYSTEM CONSISTING OF TWO DIFFERENT NEURAL NETWORK PARADIGMS WHICH ARE INTEGRATED TO PERFORM AUTOMATIC IDENTIICATION AND DEMODULATION OF DIGITAL COMMUNICATIONS SIGN ...

    SBIR Phase I 1990 Department of DefenseAir Force
  8. ADA QUALITY TOOLSET

    SBC: Software Design & Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  9. A NOVEL LEAK DETECTOR FOR XENON

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    WE DESCRIBE A NOVEL LEAK DETECTOR FOR XENON THAT HAS DIRECT APPLICATION TO TESTING RADIO-ISOTOPE-POWERED THERMOELECTRIC GENERATORS. SUCCESSFUL DEMONSTRATION OF OUR INNOVATION WILL ALLOW IMPROVED EFFICIENCY IN THERMOELECTRIC GENERATORS BY REMOVING THE HELIUM THAT IS NOW ADDED TO THE XENON BUFFERGAS FOR LEAK CHECKING PURPOSES. THE PHASE I RESEARCH PROGRAM WILL PROVIDE THE CRITICAL DESIGN INFORMATION ...

    SBIR Phase I 1990 Department of Energy
  10. COMBUSTION DIAGNOSTICS FOR MICROGRAVITY RESEARCH USING NEAR-IR DIODE LASERS

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government