You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. AN APPLICATION OF THE ANALYTIC HIERARCHY PROCESS TO THE WARFARE SYSTEMS ARCHITECT AND ENGINEER INTEGRATED ASSESSMENT ENVIRONMENT

    SBC: DANIEL H WAGNER ASSOCIATES INC            Topic: N/A

    A NOVEL APPROACH TO ASSESSING THE PERFORMANCE OF COMBINED U.S. NAVAL BATTLE FORCES IS PROPOSED. A MODEL SYSTEM BASED UPON THE ANALYTIC HIERARCHY PROCESS (AHP) AND THE USE OF PAIRWISE COMPARISON MATRICES IS USED TO DETERMINE THE RELATIVE VALUE OF COMPONENTS OF PROJECTING POWER IN THE WARFARE MISSION AREAS. THIS POWER MEASURE COMBINED ESTIMATES OF VULNERABILITY GENERATED IN A SIMILAR FASHION ARE THE ...

    SBIR Phase I 1990 Department of DefenseNavy
  2. PRELIMINARY TOUCHSCREEN DISPLAY PROTOTYPING TOOL AND TOUCHSCREEN DESIGN STUDY

    SBC: TRIDENT SYSTEMS INCORPORATED            Topic: N/A

    TOUCHSCREEN REPRESENT A SIGNIFICANT OPPORTUNITY TO ENHANCE THE OPERABILITY OF COMPLEX SYSTEMS MAN-MACHINE INTERFACES IN BOTH MILITARY AND INDUSTRY. THE ADVANTAGES OF A TOUCHSCREEN INTERFACE CAN BE SIGNIFICANTLY DIMINISHED (AND EVEN REVERSED IN EXTREME CASES) IF THE IMPLEMENTATION OF THE TOUCHSCREEN INTERFACE IS CARELESSLY DESIGNED. THE SIZE, SPACING, RESPONSE TIME, AND USE OF FEEDBACK MUST ACCOMMO ...

    SBIR Phase I 1990 Department of DefenseNavy
  3. PROTOTYPE COMPUTER AIDED TOOL FOR C3I ARCHITECTURE DESIGN

    SBC: TRIDENT SYSTEMS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseNavy
US Flag An Official Website of the United States Government