You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CYCLIC ROUTING

    SBC: Caps Logistics, Inc.            Topic: N/A

    RESEARCH TO DATE RELATED TO VEHICLE ROUTING HAS ASSUMED THATTHE CUSTOMER WILL ONLY BE VISITED ONCE IN THE TIME PERIOD UNDER CONSIDERATION. USING THIS ASSUMPTION THE PROBLEMS ARETO ASSIGN EACH CUSTOMER TO A ROUTE, SEQUENCE THE ROUTE, AND SCHEDULE THE VISIT TO EACH CUSTOMER CONSISTENT WITH THE ROUTE. FOR A LARGE CLASS OF PRACTICAL VEHICLE ROUTING PROBLEMS, THE ONE TIME PERIOD ASSUMPTION IS NOT ADEQU ...

    SBIR Phase I 1987 National Science Foundation
  2. A HIGH-EFFICIENCY TECHNIQUE FOR STEAMFLOODING DEEP, HEAVY OIL RESERVOIRS

    SBC: Carbotek Inc            Topic: N/A

    A STEAMFLOODING/STEAM GENERATION SYSTEM IS PROPOSED FOR DEEP, HEAVY OIL RESERVOIRS. THIS CONCEPT MINIMIZES THE DOWNHOLE HEAT LOSSES, IMPROVES RELIABILITY AND REDUCES THE COST OF STEAM GENERATION. ITS FEATURES WILL MAKE STEAMING OF VERY DEEP WELLS (BELOW 7500 FEET) TECHNICALLY AND ECONOMICALLY FEASIBLE, AND WILL IMPROVE THE ECONOMICS OF SHALLOWER WELL STEAMFLOODING. THIS NOVEL CONCEPT SUPPLIES HEAT ...

    SBIR Phase II 1987 Department of Energy
  3. A NOVEL, INSULATED, DOUBLE-WALLED TUBE DESIGN FOR THERMALLY-ENHANCED OIL RECOVERY

    SBC: Carbotek Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  4. RECOVERY OF CONTAMINANT METALS TO PERMIT RECYCLING OF DUSTS FROM ELECTRIC ARC FURNACES.

    SBC: Cato Research Corpon            Topic: N/A

    ELECTRIC ARC FURNACE DUST IS LISTED AS A HAZARDOUS WASTE. TOTAL PRODUCTION OF THIS DUST IS ESTIMATED TO BE 500,000 TONS AT SOME 77 LOCATION RANGING IN SCALE FORM LESS THAN 1,000 TONS TO OVER 20,000 TONS PER YEAR. A PROCESS IS PROPOSED WHICH MAY PERMIT ON-SITE, SIMPLE RECOVERY OF CONTAMINANT METALS IN THE DUST. THE PROCESS RECYCLES RECYCLES CHEMICAL REAGENTS AND AQUEOUS LEACH , MINIMIZIN COST AND A ...

    SBIR Phase I 1987 Environmental Protection Agency
  5. CHEMICALLY BONDED CERAMICS BASED ON ADVANCED HIGH STRENGTH CEMENT MATERIALS

    SBC: Cemcom Research Associates Inc            Topic: N/A

    RESEARCH WILL BE CARRIED OUT TO INVESTIGATE THE FEASIBILITY OF CHEMICALLY BONDED CERAMICS (CBC) BASED ON HIGH STRENGTH CEMENTS AS REPLACEMENT MATERIALS IN VARIOUS HIGH TECHNOLOGY APPLICATIONS. ADVANCED CEMENTS HAVE STRENGTHS AT LEAST AN ORDER OF MAGNITUDE HIGHER THAN CONVENTIONAL CEMENT PRODUCTS. COUPLED WITH LOW MATERIAL COSTS AND EASY LOW TEMPERATURE FABRICATION METHODS, THESE MATERIALS OFFER SU ...

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  6. DEVELOPMENT OF A CAPITATION MANUAL FOR STATE MEDICAID PROGRAMS

    SBC: Center For Health Policy            Topic: N/A

    THE PRIMARY PURPOSE OF THIS PROJECT IS TO DEVELOP A PRACTICAL MANUAL FOR THE PLANNING, DESIGN, AND IMPLEMENTATION OF MEDICAID ALTERNATIVE DELIVERY SYSTEM (ADS) PROGRAMS. STATE MEDICAID PROGRAM EXPERIENCES WITH HEALTH MAINTENANCE ORGANIZATIONS AND OTHER ADS PROGRAMS HAVEBEEN MIXED, WITH SOME STATES ACHIEVING THEIR COST, QUALITY OF CARE, AND ACCESS OBJECTIVES AND OTHERS NOT. STATES HAVE SOMETIMES UN ...

    SBIR Phase I 1987 Department of Health and Human Services
  7. USE OF MILLIMETER-WAVE TECHNOLOGY IN NAVAL SHIPBORNE RADAR APPLICATIONS

    SBC: CENTRA Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  8. PROCESSING OF SPENT PETROLEUM RESID DESULFURIZATION CATA- LYSTS FOR VALUE RECOVERY AND HAZARDOUS WASTE ELIMINATION

    SBC: Chemical & Metal Industries, I            Topic: N/A

    N/A

    SBIR Phase I 1987 Environmental Protection Agency
  9. THEORETICAL MODELING OF EPITAXIAL GROWTH

    SBC: Chemical Dynamics Corp            Topic: N/A

    REALISTIC YET REASONABLY SIMPLE INTERACTION POTENTIALS ARE ESSENTIAL INPUT FOR ANY COMPUTER SIMULATION INVESTIGATION. THREE-BODY OR OTHER SPECIAL TYPES OF INTERACTIONS (BEYOND PRESENT ISOTROPIC TWO-BODY POTENTIALS) ARE NECESSARY FOR SIMULATION STUDIES OF SEMICONDUCTOR PROCESSES. LACKING SUCH POTENTIALS, THE RELIABLE SIMULATION OF EPITAXIAL GROWTH IS NOT POSSIBLE. CHEMICAL DYNAMICS CORPORATION PROP ...

    SBIR Phase I 1987 National Science Foundation
  10. CONCURRENT PROCESSING IN COMPUTATIONAL CHEMISTRY

    SBC: Chemical Dynamics Corp            Topic: N/A

    THIS PROGRAM INVESTIGATES THE USE OF A NEW MIMD COMPUTER SYSTEM, THE INTEL IPSC HYPERCUBE, FOR POTENTIAL USE AS A MO-LECULAR MODELINGSYSTEM. PHASE I WILL STUDY ALGORITHMS FOR EFFICIENTLY PROGRAMMING MOLECULAR DYNAMICS SIMULATION ON THIS SYSTEM WITH CONCURRENT REALTIME GRAPHICAL ANALYSIS. THE LATEST MEMBERS OF THE IPSC FAMILY OFFER POTENTIALLY SUPERCOMPUTER PERFORMANCE IN A SYSTEM PRICED IN THE RAN ...

    SBIR Phase I 1987 National Science Foundation
US Flag An Official Website of the United States Government