You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF OXIDATION PROTECTION COATINGS FOR NB/NB5SI3 IN-SITU COMPOSITES

    SBC: UES INC            Topic: N/A

    RECENT STUDIES AT THE AIR FORCE MATERIALS DIRECTORATE (WL/MLLM) HAVE SHOWN THAT NB-NB5SI3 BASED IN-SITU COMPOSITES HAVE THE POTENTIAL FOR PROVIDING AN ACCEPTABLE BALANCE IN LOW-TEMPERATURE TOUGHNESS AND HIGH-TEMPERATURE STRENGTH/CREEP RESISTANCE, AND THEREFORE, ARE ATTRACTIVE CANDIDATES AS HIGH-TEMPERATURE STRUCTURAL MATERIALS FOR ADVANCED AEROSPACE APPLICATIONS. HOWEVER, CATASTROPHIC OXIDATION AN ...

    SBIR Phase I 1991 Department of DefenseAir Force
  2. LOW COST UNIFIED EXPERT SYSTEM TOOL FOR MANUFACTURING

    SBC: ARCTOS Technology Solutions, LLC            Topic: N/A

    THE POSITIVE IMPACT OF EXPERT SYSTEMS UPON MANUFACTURING CAN BE HEIGHTENED BY ELIMINATION OF SOME OF THE IMPEDIMENTS OF THE KNOWLEDGE ENGINEERING PROCESS. THIS PROPOSAL FEATURES THE USE OF LOW-COST PERSONAL COMPUTERS, COGNITIVE PSYCHOLOGY AND KNOWLEDGE-RICH EXPERT SYSTEMS TO DEMONSTRATE THE FEASIBILITY OF A UNIFIED (ACQUISITION, REFINEMENT AND DELIVERY) EXPERT SYSTEM TOOL. SUCH A TOOL CAN BE WIDEL ...

    SBIR Phase I 1987 Department of DefenseAir Force
  3. REQUIREMENTS FOR AN AUTOMATED HUMAN FACTORS, MANPOWER, PERSONNEL AND TRAINING (HMPT) PLANNING TOOL

    SBC: Vector Research Company, Inc.            Topic: N/A

    THE PHASE I RESEARCH WILL ESTABLISH THE FUNCTIONAL AND INFORMATION REQUIREMENTS FOR AN EFFECTIVE AUTOMATED DESIGN ANALYSIS AND CREW PERFORMANCE ASSESSMENT METHODOLOGY FOR USED IN PREMILESTONE I PLANNING. THE INFORMATION STRUCTURE WILL INCLUDE PROCESS, TASK, DYNAMIC CREW PEFORMANCE, OPERATOR GRAPHIC AND HUMAN FACTORS PARAMETERS, AND TRAINING REQUIREMENTS. EXISTING AUTOMATED TOOLS SUCH AS THE IDEFO ...

    SBIR Phase I 1991 Department of DefenseAir Force
  4. EFFECT OF WELD DISCONTINUITIES ON THE MECHANICAL PROPERTIES OF ARMOR

    SBC: Welding Consultants Inc            Topic: N/A

    WELDED JOINTS INVARIABLY CONTAIN IMPERFECTIONS OR DISCONTINUITIES. AS NONDESTRUCTIVE EVALUATION TECHNIQUES IMPROVE MORE OF THESE DISCONTINUITIES ARE DETECTED. IF ARBITRARY ACCEPTANCE CRITERIA FOR WELD DISCONTINUITIES ARE ADOPTED, UNNECESSARY WELD REPAIRS WILL BE REQUIRED. THIS WILL LEAD TO SIGNIFICANT INCREASES IN FABRICATION COSTS,DELAYS IN PRODUCTION AND TO AN OVERALL REDUCTION IN QUALITY SINCE ...

    SBIR Phase I 1987 Department of DefenseArmy
US Flag An Official Website of the United States Government