You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Ultrafast Physical Random Number Generation Using Chaos

    SBC: Torch Technologies, Inc.            Topic: A14AT002

    Random numbers are essential for a growing number of modern applications. As computer speed and communications bandwidth have increased the potential for practical streaming cipher and large-scale Monte Carlo simulations have become technologically feasible. For these and other applications, ultrafast random number generators are essential. This is intuitively clear. Additionally, however, the ide ...

    STTR Phase II 2016 Department of DefenseArmy
  2. Energy Harvesting Fabric

    SBC: STREAMLINE AUTOMATION LLC            Topic: A15AT017

    A human produces more than 100 Watts of waste heat during normal activity. If a fraction of this heat energy can be harvested it can replace the stored chemical energy in one or more of the batteries typically carried by soldiers in the field. The current generation batteries, such as the BB2590 are bulky and rigid. The PowerFelt material developed by Wake Forest University is ideally suited for h ...

    STTR Phase I 2016 Department of DefenseArmy
  3. Compact Megavolt Switch Utilizing Novel Switching Mediums

    SBC: ASR Corporation            Topic: N14AT018

    The Navy has a need to control such extreme power specifications that no suitable switches exist. The Navy power specifications require us to develop a novel medium (probably a pressurized gas or liquid) that can be configured to meet the requirements and control the flow of electrical power directly. Our extensive switching expertise has allowed us to develop a series of novel test fixtures and t ...

    STTR Phase II 2016 Department of DefenseNavy
  4. Nonlinear-DSP-Enabled RF-Photonic Link

    SBC: RAM PHOTONICS LLC            Topic: N14AT023

    Digital equalizers have been the major enablers in RF communications in terms of managing component imperfections and channel impairments. Specifically, the ever increasing processing power of the dedicating computing processors has availed a steady increase in the ability of complex communication systems to deal with impairments as well as allowing higher capacities in the information transfer.On ...

    STTR Phase II 2016 Department of DefenseNavy
  5. Decision Making under Uncertainty

    SBC: GCAS, Inc.            Topic: MDA13T001

    Our proposed second order uncertainty (SOU) product is a decision making software solution that addresses the problem of providing accurate and precisely defined decision courses of action (COAs) of complex, time-constrained problems in a fraction of the time required by alternative methods striving to achieve the same level of precision. Complex decision situations can deal with large volume of ...

    STTR Phase II 2016 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government