You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Engaging the Manufacturing Industrial Base in Support of the DLA Nuclear Enterprise and Other Critical Supply Chain
SBC: AMG ENGINEERING & MACHINING INC Topic: DLA193001Part Number: 525133-1 Utilizing 5-axis mill and dovetail fixturing, mill housing (item 1). On vertical mill create installation tool (525134). Working with specialty glass house, develop 525132 (quartz window) holding flatness of 3 wavelengths per inch and parallel to 3 archmin. Develop application (with same specialty glass house) of ¼ wave magnesium fluoride applied to both surface B and opposi ...
SBIR Phase I 2020 Department of DefenseDefense Logistics Agency