You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Development of Handiplate Accessible Parking Placard
SBC: Handiplate Topic: N/AThe goal is to produce an electronic programmable disabled or Handicapped Placard, which cannot be forged, altered or compromised to insure credibility in the program.The final placard will be designed to enable law enforcement and parking enforcement to observe from a distance, if the placard is valid. By use of LEDs, one facing the front, one facing the rear, it permits and easy and quick visua ...
SBIR Phase I 2001 Department of Transportation -
Rim-Integrated-Pumps-Sensor (RIPS) Platform for Self-sensing and Inflation using MEMS Microsensors and Micropumps
SBC: INTELLIGENT OPTICAL SYSTEMS, INC. Topic: N/AIOS and the University of Arkansas propose to design a novel and compact platform consisting of Micro-Electro-Mechanical-Systems (MEMS) devices designed to 1) automatically sense and control tire pressure, 2) generate and store power from tire vibration, 3) telemeter data to the driver cabin or road side service analyzers, and 4) be installed by the factory on new cars or retrofitted onto existing ...
SBIR Phase I 2001 Department of Transportation -
Sidewalk Assessment Process
SBC: Moore Iacofano Goltsman, Inc Topic: N/ASidewalks provide pedestrians with critical transportation routes to public areas and services such as schools, businesses, and recreation facilities. Unfortunately, many sidewalks do not adequately meet the needs of people with disabilities, who make up nearly one-fifth of the American population. The American with Disabilities Act (ADA) of 1990 prohibits public entities from designing new faci ...
SBIR Phase I 2001 Department of Transportation -
N/A
SBC: EBERT COMPOSITES CORPORATION Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: EBERT COMPOSITES CORPORATION Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
N/A
SBC: Phoenix Scientific, Inc Topic: N/AN/A
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: Phoenix Scientific, Inc Topic: N/AN/A
SBIR Phase II 2000 Department of Transportation -
N/A
SBC: Physical Optics Corporation Topic: N/ANot Available This project proposes design, manufacture, and testing of an ultra-low weight and volume hybrid turbomolecular pump (TMP). The pump will provide a pumping speed density of roughly 100 l/s/kg (state of the art is 50 l/s/kg) while keeping the pump diameter to
SBIR Phase I 2000 Department of Transportation -
N/A
SBC: WaveBand Corporation Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
Accurate Identification of Explosives in Baggage
SBC: Zaptron Systems, Inc. Topic: N/ANot Available Aluminum-Beryllium alloys (A1BeMet) are binary alloys that combine the high modulus and low density characteristics of beryllium with the fabrication and mechanical property behavior of aluminum. These characteristics are extremely desirable for advanced satellite and space applications. Cost($2000/lb) of the alloys has been the main drawback to their use. By combining thin A1BeMet ...
SBIR Phase I 1999 Department of Transportation