You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEVELOPMENT OF A PROCESS TO SYNTHESIZE TUBLAR FULLERENES
SBC: ATS-MER, LLC Topic: N/AN/A
SBIR Phase I 1992 Department of Energy -
AN ION PROBE FOR TIGHTLY-FOCUSED CHARGED PARTICLE BEAMS
SBC: MISSION RESEARCH CORP. Topic: N/AN/A
SBIR Phase I 1992 Department of Energy -
A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
NOVEL ULTRASONIC THERMOMETERS WITH NON-METAL SENSING ELEMENTS FOR HOSTILE ENVIRONMENTS
SBC: Research And Manufacturing Co Topic: N/AN/A
SBIR Phase I 1992 Department of Energy -
A LOW COST RADIAL FLOW SOLID OXIDE FUEL CELL
SBC: TECHNOLOGY MANAGEMENT INC Topic: N/ATHIS RESEARCH STUDIES A NEW PLANAR SOLID OXIDE FUEL CELL (SOFC) GEOMETRY THAT FEATURES RADIAL FLOW OF FUEL AND OXIDANT STREAMS THROUGH PARTICULATE ELECTRODES (THE INTERSCIENCE RADIAL FLOW (IRF) FUEL CELL). THE TWO KEY PHYSICAL CHARACTERISTICS OF IRF DESIGN ARE THE POROUS, PARTICULATE ELECTRODES AND THE RADIAL DESIGN. PARTICULATE ELECTRODES ELIMINATE PROBLEMS CAUSED BY MISMATCHES IN THE THERMAL EXP ...
SBIR Phase I 1992 Department of Energy -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A SOLUBLE SOLUTION FLUE GAS DESULFURIZATION AND DENOX PROCESS
SBC: American Process Design Inc Topic: N/APILOT PLANT WORK IS BEING CARRIED OUT ON THE REDUCTION OF SODIUM SULFITE CONTAINING SOME SODIUM SULFATE INTO SODIUM SULFIDE, A KEY STEP IN THE SOLUBLE SOLUTION PROCESS FOR REMOVAL OF SULFUR OXIDES, NITROGEN OXIDES, AND PARTICULATES FROM THE FLUE GAS OF COAL-FIRED UTILITIES. IN THE FLUE GAS ABSORPTION STEP, A SOLUTION OF SODIUM CARBONATE IS USED TO REACT WITH SULFUR DIOXIDE TO FORM PRIMARILY SODIUM ...
SBIR Phase I 1992 Department of Energy -
FIELD-PORTABLE INSTRUMENTATION FOR METAL ANALYSIS
SBC: Farachem Technology, Inc. Topic: N/AFIELD-PORTABLE INSTRUMENTATION SUITABLE FOR ONSITE METAL ANALYSIS IS NEEDED. SUCH INSTRUMENTATION SHOULD PERMIT (1) ANALYSIS IN REAL TIME, (2) SIMULTANEOUS DETECTION OF VARIOUS METALS, AND (3) DETECTION LEVELS DOWN TO PARTS PER BILLION. IN PHASE I, THE SUITABILITY OF AN ELECTROCHEMICAL MEASUREMENT CONCEPT TO ACHIEVE THESE PERFORMANCE CHARACTERISTICS WILL BE ESTABLISHED. PHASE I CONSISTS OF THE FOL ...
SBIR Phase I 1992 Department of Energy -
EPITAXIAL WIDE-BANDGAP SEMICONDUCTOR FILMS FOR IMPROVED DETECTORS AND ELECTRONICS
SBC: LAWRENCE SEMICONDUCTOR RESEARCH LABORATORY, INC. Topic: N/ATHIS RESEARCH PROJECT ADDRESSES THE DEMONSTRATION OF EPITAXIAL GROWTH, BY LASER ABLATION IN AN ULTRAHIGH VACUUM SYSTEM, OF HIGH QUALITY, WIDE-BANDGAP SEMICONDUCTOR FILMS ONTO HEATED SINGLE-CRYSTAL SILICON SUBSTRATES, FOLLOWED BY CHEMICAL VAPOR DEPOSITION (CVD) EPITAXIAL GROWTH OF SILICON ONTO THE WIDE-BANDGAP SEMICONDUCTOR. ON THE BASIS OF RECENT REPORTS OF SUCCESSFUL EPITAXIAL GROWTH OF CUBIC BOR ...
SBIR Phase I 1992 Department of Energy -
A COMPACT SIMULATOR FOR TRAINING OF OPERATORS AND MAINTENANCE PERSONNEL
SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA Topic: N/ATII SHALL PROCURE, DESIGN, CONSTRUCT, AND TEST A COMPACT PORTABLE SIMULATOR CAPABLE OF EMULATING NUCLEAR POWER STATION-OPERATOR (NPS-OP) INTERFACES, AND EVALUATE AND TEST VARIOUS INTERFACE DESIGNS. THE SUMULATOR WILL BE DESIGNED FOR OPERATOR TRAINING ON ADVANCED REACTORS AND WILL BE USED IN SIMULATING OPERATORS SCENARIOS AND RECORDING AND DOCUMENTING REAL-TIME INPUT FROM THE OPERATOR. THE SIMULATO ...
SBIR Phase I 1992 Nuclear Regulatory Commission