You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. AIRCRAFT CANOPY TRAJECTORY SIMULATION MODEL

    SBC: APPLIED SIMULATIONS INC            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseNavy
  2. Aircraft Drag Reduction Using Distributed Suction And Adaptive Control Techniques

    SBC: Innovative Aerodynamic            Topic: N/A

    N/A

    SBIR Phase I 1995 National Aeronautics and Space Administration
  3. Aircraft Noise Impact Reduction Decision Support System

    SBC: Quantech, Inc.            Topic: N/A

    This proposal presents the phased development of a Decision Support System for Aircraft Environmental Noise Impact Prediction. The Decision System has several components including an acoustic source modeling component, an acoustic propagation component, a visualization/audio component, and an applications module. The technical basis for the system is the adaption and refinement of source and pro ...

    SBIR Phase I 1995 Department of DefenseAir Force
  4. Aircraft Repair and Modification Cost Estimating Query System

    SBC: SYSTEMS PLANNING & ANALYSIS, INC.            Topic: N/A

    The problem adressed is the design and development of a database of historical aircraft maintenance repair and modification data. The database is to contain significant cost estimating criteria and applicable values form previous actual modification and repair program. Cost estimateing realtionships (CERs) would then be developed wich would allow planners and cost estimators to produce accurate an ...

    SBIR Phase I 1994 Department of DefenseNavy
  5. Air Release Valve and Control for Airbags

    SBC: Warrick & Assoc., Inc.            Topic: N/A

    An air pressure relief valve for airbags is described that has high frequency response owing to its low inertial mass. It is able to open to expose up to 2 square feet of exhaust area within .010 second, thus achieving optimum energy management. The relief valve operation is passive; it is opened and closed by variation of air pressure within the airbag, rather than any external power source. T ...

    SBIR Phase I 1997 Department of DefenseArmy
  6. A Job Performance Measurement System

    SBC: Research Development Corporation            Topic: N/A

    As organizations move toward increased performance measurement and accountability, there is an increasing need to measure job performance at the individual worker level. Traditional assessment tools have been criticized as measuring test taking skills more than job performance skills. A number of approaches have been developed to address this weakness by measuring performance in practical proble ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. A knowledge Assessment Tool for Complex Cognitive Skills

    SBC: Research Development Corporation            Topic: N/A

    Today's workforce requires higher skill levels than ever before. This necessitates effective training technologies. A key component of the training process is assessing trainee performance and critical learning needs. Traditional assessment tools have been criticized as measuring test taking skills more than problem solving skills. A number of approaches have been developed to address this wea ...

    SBIR Phase I 1997 Department of DefenseNavy
  8. A Large-Area Air Mass 1.5 Non-Pulsed Solar Simulator for Testing Photovoltaic Modules: An Experimental Design

    SBC: Sc-international Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Energy
  9. Algorithms for Health Care Quality Management and Outcomes Assessment

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    American health care is in the midst of momentous change. Quality improvement principles are being used increasingly to enhance productivity and efficiency of health care delivery and to help contain costs. In producing patient outcomes and resource utilization measures, it is vital to control appropriately for case mix (i.e., differences in patients due, e.g., to illness severity) in the predicti ...

    SBIR Phase I 1997 Department of Commerce
  10. All-Optical Switches for Self-Routing Multiplexed Networks

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    The proposed SBIR program will accelerate the commercialization of multiplexed optical fiber networks and their use in both DoD and commercial systems. F&S (Fiber & Sensor Technologies, Inc.) proposes to implement all-optical low-loss switches for signal multiplexing in large networks. This new approach to multiplexing is based on the development of optically-activated in-line switches to automa ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government