You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  2. Vector-Multiprocessing Algorithm For The Solution Of Large Geophysical Inverse Problems

    SBC: Space Systems Analysis, Inc.            Topic: N/A

    The primary objective of the proposed investigation is to develop numerical tools capable of producing scalable algorithms for efficient solution of a general class of large geophysical inverse problem in a massively parallel processing (MPP) computing environment. An example problem is the rigorous solution of the Earth's gravity field using massive satellite data. Currently, such a solution can ...

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  3. Innovative Approaches to the Design of Visually Covert Low Power, Low Gain Antennas In The Range of 2-2000 MHz

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  4. THE APPLICATION OF PARALLEL PROCESSING TO COORDINATE ASW OPERATIONS

    SBC: METRON INCORPORATED            Topic: N/A

    THE PROBLEM AREA WE PROPOSE TO INVESTIGATE IS THE APPLICATION OF PARALLEL PROCESSING ALGORITHMS AND TECHNOLOGY TO COORDINATE ANTISUBMARINE WARFARE (ASW) OPERATIONS. OUR TECHNICAL OBJECTIVES ARE TWO-FOLD: 1) TO CONSIDER A SPECIFIC EXAMPLE OF DISCRETE NONLINEAR FILTERING, ANALYZE THE PARALLELISM IN THE DISCRETE FILTERING ALGORITHM, AND DEVELOP NEW ALGORITHMS FOR PARALLEL PROCESSORS COUPLED WITH A TH ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  5. Simulation Based Design for Large Complex COTS Based Systems

    SBC: TRIDENT SYSTEMS LLC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  6. GENERATING ROBUST PLANS IN ADVERSARIAL ENVIRONMENTS

    SBC: Decision Science Associates            Topic: N/A

    DECISION SCIENCE CONSORTIUM, INC. (DSC) PROPOSES TO ENGAGE IN AN INNOVATIVE RESEARCH PROGRAM TO DESIGN AND IMPLEMENT AN ADVERSARIAL PLANNING SYSTEM THAT IS ABLE TO REASON ABOUT THE PERSISTENCE OVER TIME OF AN ADVERSARY'S BELIEF AND INTENTIONS. SPECIFICALLY, THIS SYSTEM WILL UTILIZE EITHER A NONMONOLITHIC SITUATIONAL OR TEMPORAL LOGIC TO DETERMINE THE EXTENT TO WHICH AN ADVERSARY'S PRESENT BELIEFS ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  7. AUTOMATED SUPPORT FOR CREATION AND MAINTENANCE OF LARGE SITUATION BASED ONTOLOGIES

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    IN THE CONTEXT OF INFORMATION MANAGEMENT, ONTOLOGY IS THE TASK OF EXTRACTING THE NATURE AND STRUCTURE OF A GIVEN EINGEERING, MANUFACTURING, BUSINESS, OR LOGISTICAL DOMAIN AND STORING IT INAN EXPRESSIVELY RICH, USABLE, COMPUTATIONALLY FEASIBLE REPRESENTATIONAL MEDIUM. AN ARRAY OF ONTOLOGY DATABASES IN USE ACROSS A WIDE VARIETYOF SUCH SYSTEMS WOULD REVOLUTIONIZE THE TASKS OF INFORMATION MANAGEMENT A ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  8. LONG DURATIONN BALLOON TECHNOLOGY

    SBC: Winzen Engineering, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
  9. RELIABLE OBJECT BASED ARCHITECTURE FOR INTELLIGENT CONTROLLERS (ROCS)

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: N/A

    RELIABLE OBJECT-BASED CONTROL SOFTWARE (ROCS) ISA PROGRAMMING TECHNOLOGY THAT CAN BE COMBINED WITH BOTH INDUSTRIAL PROGRAMMABLE CONTROLLERS AND POWERFUL RISC BASED PROCESSORS TO CONSTRUCTFLEXIBLE CONTROL COMPONENTS OF GENERAL PURPOSE MACHINE TOOLS. ROCS ALSO SUPPORTS THE COMBINATION OF THOSE COMPONENTS INTO INNOVATIVE STATION, CELL, CENTER OR FACTORY AUTOMATION CONCEPTS. THE PROPOSED TECHNOLOGY WO ...

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  10. BROADBAND PLASMA BARRIERS FOR HARDENING OPTICAL SENSORS IN THE 8-12 MICRON REGION

    SBC: Antropix Corpon            Topic: N/A

    ANTROPIX CORPORATION PROPOSES TO OBTAIN TIME - RESOLVE OPTICAL PROPERTIES MEASUREMENTS (PLASMA OPACITY IN THE 8 - 12 MICRON SPECTRAL REGION, AS WELL AS STARK BROADENING AND RELATIVE INTENSITY PARAMETERS) ON BROADBAND PLASMA BARRIERS (BPBS) GENERATED BY LASER ACTIVATION OF ALKALI METAL (E.G., NA AND CS) VAPORS. SIMILAR MEASUREMENTS WILL BE COMPLETED ON KNOWN PHASE TRANSITION MATERIALS (PTMS) SUCH A ...

    SBIR Phase I 1988 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government