You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

Displaying 71 - 80 of 207728 results
  1. Interline CCD for Low light Imagery

    SBC: Fairchild Imaging            Topic: A04116

    There is a need to complement the current Gen III image intensifier imaging system with a solid-state low light level camera that is better optimized for remote viewing applications. A silicon-based solution is an ideal candidate for low light imaging because of its high quantum efficiency, low dark current, and excellent uniformity. However, to meet performance requirements under overcast starl ...

    SBIR Phase II 2006 Department of DefenseArmy
  2. Portable Kinetic Metallization Process and Device for Minor Structural and Protective Coating Repair of Aluminum and High-Strength Steels

    SBC: INNOVATIVE TECHNOLOGY INC            Topic: N07122

    Inovati to proposes to train Air Force staff on operation of the prototype Kinetic Metallization System (KMS) equipment delivered and installed at WPAFB with prototype software for repairing F-16 wheels and A-10 NLG pistons and other aircraft components enabled by deployment of a robot with extended axis capabilities integrated with the KMS equipment. The objective of this project to deliver a pro ...

    SBIR Phase II 2020 Department of DefenseNavy
  3. ARES DV Flight Control Integration and Testing

    SBC: PIASECKI AIRCRAFT CORP            Topic: AF20RDCSO1

    This scope of work is an important incremental step towards the overarching program goal of flight demonstrating the ARES DV under follow on Phase II/III efforts. that include completion of tethered hover testing and hover, transition, and cruise flight t

    SBIR Phase II 2022 Department of DefenseAir Force
  4. Dual Band X/Ka On-The-Move Antenna System

    SBC: THINKOM SOLUTIONS, INC.            Topic: A06127

    The proposed project will realize a low profile, circularly polarized, X/Ka-band antenna system designed for Communication On-The-Move applications. The preliminary X-Band antenna design was successfully accomplished in Phase I, with mating Ka-band antenna and common gimbal concepts included. A preliminary Ka-Band antenna design is planned for the Phase I Option. The complete detailed design of ...

    SBIR Phase II 2007 Department of DefenseArmy
  5. Dimensional Restoration of Aircraft Components Damaged by Corrosion

    SBC: ENGINEERING AND SOFTWARE SYSTEM SOLUTIONS, INC.            Topic: AF131190

    Aircraft and ground support equipment typically require restoration of structure and components damaged by corrosion, wear, and other surface defects. Current repair techniques inspect, clean, and then apply Corrosion Preventative Compounds, but do not provide dimensional restoration. Additionally, these traditional repair techniques may utilize and/or produce hazardous materials and waste. Conseq ...

    SBIR Phase II 2019 Department of DefenseAir Force
  6. Commercialization of Safe and Effective Locoregional Head and Neck Cancer Therapy

    SBC: PRIVO TECHNOLOGIES, LLC            Topic: NIDCR

    According to the Oral Cancer Foundation, over 51,000 Americans are diagnosed with oral and pharyngeal cancer this year, causing over 10,000 deaths, roughly one person every hour. Over 640,000 new oral cancer cases were diagnosed worldwide, and only half will live more than 5 years after initial diagnosis. By 2020, the annual worldwide incidence is predicted to increase to over 840,000, a 30% rise, ...

    SBIR Phase II 2021 Department of Health and Human ServicesNational Institutes of Health
  7. Watchtower

    SBC: PRAESES, LLC            Topic: AF171114

    On behalf of the U.S. Air Force, AFRL’s Center for Rapid Innovation (CRI) sought a Command and Control (C2) capability to bridge the information gap and unify the many disparate data sources required for Situational Awareness (SA) and Decision Support in the maintenance and security operations of US ICBM missile fields. The scope of this effort is to further develop the foundational technology c ...

    SBIR Phase II 2022 Department of DefenseAir Force
  8. Visual biofeedback to reduce head motion during MRI scans

    SBC: TURING MEDICAL TECHNOLOGIES INC            Topic: 101

    Project Abstract/Summary The goal of this STTR application is to deliver a brain MRI technology that feeds back head motion measurements derived from our Framewise Integrated Real-Time MRI Monitoring (FIRMM) to MRI scan participants in order to reduce head motion via behavioral training. Because MRI scanning produces high- resolution images and does not expose patients to radiation, it has become ...

    SBIR Phase II 2020 Department of Health and Human ServicesNational Institutes of Health
  9. Integrated Weather Observation Transition

    SBC: INTELLISENSE SYSTEMS INC            Topic: AF191039

    To address the Air Force’s need for a man-portable, high-accuracy expeditionary environmental observation device that replicates the automated gathering and reporting of the same measurements currently performed by the AN/TMQ-53 for Service Level D airfie

    SBIR Phase II 2023 Department of DefenseAir Force
  10. Optical Grade Sapphire Manufacturing Growth Process for IR Window Applications

    SBC: Rubicon Technology, Inc.            Topic: AF101C001

    ABSTRACT: Sapphire possesses a number of physical properties, including high strength, high melting point, chemical inertness, and excellent transparency in the visible and IR spectrum, which make it an attractive window material for military applications. For Phase I, Rubicon Technology demonstrated a sapphire crystal growth process to MRL 5 capable of growing slabs 20"x 14". During Phase II th ...

    SBIR Phase II 2012 Department of DefenseAir Force
US Flag An Official Website of the United States Government