You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FEASIBILITY OF INCORPORATING AUDIO SUPPORT INTO ENGLISH COMPOSITION CAI FOR ADULT LEARNERS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    THE PROPOSED RESEARCH FOCUSES ON A STUDY OF THE FEASIBILITY AND EFFECTIVENESS OF AUGMENTING A COMPUTER-BASED INSTRUCT- IONAL PACKAGE IN ENGLISH COMPOSITION FOR ADULT LITERACY STUDENTS WITH AUDIO SUPPORT. THIS AUGMENTATION IS MADE POSSIBLE THROUGH THE USE OF A UNIQUE COMPUTER-INTERFACABLE AUDIOTAPE TECHNOLOGY DEVELOPED BY MEMBERS OF THE PROPOSED PROJECT TEAM UNDER ANOTHER FEDERAL CONTRACT. THIS TEC ...

    SBIR Phase II 1989 Department of Education
  2. DEVELOPMENT OF A HIGH DYNAMIC RANGE DOWNHOLE SIGNAL CONDITIONING MODULE

    SBC: Applied Research Associates, Inc.            Topic: N/A

    HIGH RANGE (200,000 G) ACCELEROMETERS ARE THE ONLY TRANSDUCERS THAT PROVIDE THE REQUIRED LONG-TERM DATA IN THE ENVIRONMENTS OF INTEREST TO THE BLAST AND SHOCK COMMUNITY. THESE GAGES HAVE A VERY LARGE DYNAMIC RANGE AND NOISE OFTEN MASKS THE LATE TIME (BUT EXTREMELY IMPORTANT) DATA. WE PROPOSE TO DEVELOP A CLOSE COUPLED LOGARITHMIC GAIN SIGNAL CONDITIONING SYSTEM THAT WILL CORRECT THE LATE TIME NOIS ...

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  3. PROCESSED VAPOR GROWN GRAPHITE FIBERS FOR ELECTROMAGNETIC RAILGUNS

    SBC: Applied Sciences Inc.            Topic: N/A

    REQUIREMENTS FOR RAILGUN ARMATURES DICTATE MATERIALS PROPERTIES VALUESWHICH ARE DIFFICULT TO OBTAIN FROM CONVENTIONAL MATERIALS. THE NEED EXISTS FOR A MATERIAL WHICH HAS LOW DENSITY, HIGH MELTING POINT, HIGH THERMAL CONDUCTIVITY, LOW COEFFICIENT OF THERMAL EXPANSION, HIGH ELECTRICAL CONDUCTIVITY, HIGH VALUES FOR STRENGTH, AND GOOD CHARACTERISTICS OF LUBRICITY. GRAPHITE FIBER GROWN FROM PYROLYSIS O ...

    SBIR Phase II 1989 Department of DefenseMissile Defense Agency
  4. TARGET PREDICTION ALGORITHMS AND IMPLEMENTATION

    SBC: A-TECH CORPORATION            Topic: N/A

    THE INTENT OF THIS WORK IS TO DEVELOP AN ADVANCED ESTIMATED ALGORITHM FOR MANEUVERING TARGET STATE ESTIMATION AND PREDICTION FOR FIRE CONTROL AND TO DEVELOP A DESIGN OF A VHSIC SYSTOLIC ARRAY FOR IMPLEMENTATION OF THE ALGORITHM. THE DESIGN OF THE ALGORITHM WILL CONSIDER MANEUVERING TARGETS INCLUDING AIRCRAFT AND HELICOPTERS. IT WILL INCLUDE THE USE OF ADVANCED SENSOR INFORMATION SUCH AS AN IMAGERY ...

    SBIR Phase II 1989 Department of DefenseArmy
  5. DAMPER- DIGITAL ACTIVE MATERIALS-PROCESSING PLATFORM EFFORT

    SBC: A-TECH CORPORATION            Topic: N/A

    THE DIGITAL ACTIVE MATERIALS-PROCESSING PLATFORM EFFORT BE- ING PROPOSED HERE SEEKS TO DEVELOP AN ACTIVELY STABILIZD PLATFORM UPON WHICH MICRO-G MATERIALS PROCESSING EXPERIMENTSCAN BE PERFORMED IN SPACE. WITH THE SUC- CESSFUL COMPLETION OF THE TWO-STEP PHASE I WORKPLAN APPLIED TECHNOLOGY ASSOCIATES (ATA) HAS CLEARLY AND SUCCINTLY DEFINED THE PROBLEM OF PLATFORM ISOLATION IN SPACE AND HAS COMPLETEL ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  6. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    A FEASIBILITY STUDY OF IMPROVING DECOY PENETRATION AID (PENAID) PERFORMANCE BY SUPPLYING MEANS TO 1) ALLOW FOR DUAL CENTER OF GRAVITY (CG) LOCATION, THEREBY ENABLING INDEPENDENT FULFILLMENT OF IMPULSE BALANCING AND REENTRY STABILITY REQUIREMENTS; AND/OR 2) COUNTERACT DECOY CONING BY SENSING ITS PRESENCE, AND CORRECTING THE ANGULAR MOMENTUM OF THE DECOY TO ELIMINATE CONING.

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  7. ACCEPTANCE TEST CONCEPTS FOR MECHANICAL SYSTEMS

    SBC: Architectural Energy Corporati            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED PROJECT IS TO DEVELOP A COMPREHENSIVE ACCEPTANCE TEST PROCEDURE THAT DETERMINES WHETHER AIR DISTRIBUTION SYSTEMS IN NEW BUILDINGS ARE INSTALLED PROPERLY AND OPERATING IN AN ENERGY EFFICIENT MANNER. THE APPROCH IS TO MEASURE CRITICAL ENERGY, FLOW, PRESSURE AND TEMPERATURE PARAMETERS AND TO COMPARE THESE RESULTS WITH EXPECTED VALUES FROM DESIGN CALCULATIONS AND ENGINEER ...

    SBIR Phase II 1989 Department of DefenseArmy
  8. SUPPRESSION OF COMBAT VEHICLES

    SBC: Area Therm Corp.            Topic: N/A

    ATC PROPOSES TO THERMALLY SUPPRESS A COMBAT VEHICLE OF THE MARINES' CHOICE. ATC SUBMITS THAT THE PROPOSED DESIGN NOT ONLY WILL DEMONSTRATE EXCELLENT THERMAL SUPPRESSION, BUT POSSIBLY MAY BE THE BEST DAY AND NIGHT PERFORMING SUPPRESSOR ON THE MARKET TODAY OR IN THE NEAR FUTURE. ATC HAS USED ITS TECHNOLOGY TO SUPPRESS OPERATING MIL-STD ENGINE-GENERATOR SETS TO NEAR PERFECT SUPPRESSION. THERE IS NO T ...

    SBIR Phase II 1989 Department of DefenseNavy
  9. AUTOMATED BEHAVIORAL HEARING TESTING DEVICE FOR INFANTS

    SBC: Artificial Hearing Systems Cp            Topic: N/A

    CONCERN ABOUT THE EFFECTS OF HEARING IMPAIRMENT ON A CHILD'S DEVELOPMENT IS CAUSING HEARING EVALUATION TO BECOME A ROUTINE PART OF PEDIATRIC CARE. WHILE THE COMMERCIAL MARKET HAS FOCUSED ON THE IMPROVEMENT OF ELECTROPHYSIOLOGIC PROCEDURES AND EQUIPMENT, BEHAVIORAL PROCEDURES WHICH MAY BE MORE APPROPRIATELY USED WITH OLDER INFANTS AND CHILDREN HAVE BEEN LARGELY IGNORED. THE OVERALL GOAL OF THIS PRO ...

    SBIR Phase II 1989 Department of Health and Human Services
  10. EXHAUST HEAT DRIVEN THERMOELECTRIC FAN

    SBC: Aspen Systems, Inc.            Topic: N/A

    DURING COLD AMBIENT CONDITIONS, THE THERMAL GRADIENTS CREATED BY STANDARD NON-ELECTRIC MILITARY HEATERS IN ARMY TENTS AND BARRACKS PRODUCE UNCOMFORTABLE LIVING CONDITIONS. CIRCULATION OF THE INTERIOR AIR BY A FAN REDUCES SIGNIFICANTLY THE THERMAL GRADIENTS. HOWEVER, WITH THE ABSENCE OF ELECTRICITY, THERE IS A NEED FOR POWER NOT ONLY FOR THE FAN BUT ALSO FOR OTHER ELECTRICAL EQUIPMENT. ASPEN SYSTEM ...

    SBIR Phase II 1989 Department of DefenseArmy
US Flag An Official Website of the United States Government