You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS SYSTEM REQUIREMENTS FOR BOTH ACTIVE AND PASSIVE DECOYS.

    SBC: APTEK, Inc.            Topic: N/A

    APTEK, AS PRIME CONTRACTOR, IN CONJUNCTION WITH GENERAL ELECTRIC COMPANY AND SRI INTERNATIONAL, AS SUBCONTRACTORS, WILL CONDUCT A STUDY TO IDENTIFY AND INVESTIGATE CANDIDATE OVERLAY MATERIALS VERSUS SYSTEM REQUIREMENTS FOR BOTH ACTIVE AND PASSIVE DECOYS. OVERLAY MATERIALS DEVELOPED BY THE NH&S COMMUNITY WILL BE CONSIDERED AS WELL AS PREVIOUSLY UNEVALUATED CANDIDATES SUCH AS RARE EARTH BORIDES. THE ...

    SBIR Phase I 1985 Department of DefenseDefense Threat Reduction Agency
  2. THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL.

    SBC: APTEK, Inc.            Topic: N/A

    THIS ACTIVITY WILL DEVELOP AND DEMONSTRATE A METHOD TO SUPERIMPOSE A SIGNAL ON DATA CHANNELS WHICH WILL IDENTIFY THE PARTICULAR DATA CHANNEL. THE SIGNAL WILL BE GENERATED AS A BINARY CODE. INCLUDED WILL BE THE DESIGN, DEVELOPMENT AND TESTING OF ONE OR MORE PROTOTYPE CHANNEL IDENTIFIER SYSTEM(S) TO INTERFACE WITH REPRESENTATIVE DATA ACQUISITION SYSTEM(S). PRODUCTION CONFIGURATION AND COST INFORMATI ...

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  3. HARDENED IMPROVED DYNAMIC RESPONSE DECOY

    SBC: APTEK, Inc.            Topic: N/A

    A FEASIBILITY STUDY OF IMPROVING DECOY PENETRATION AID (PENAID) PERFORMANCE BY SUPPLYING MEANS TO 1) ALLOW FOR DUAL CENTER OF GRAVITY (CG) LOCATION, THEREBY ENABLING INDEPENDENT FULFILLMENT OF IMPULSE BALANCING AND REENTRY STABILITY REQUIREMENTS; AND/OR 2) COUNTERACT DECOY CONING BY SENSING ITS PRESENCE, AND CORRECTING THE ANGULAR MOMENTUM OF THE DECOY TO ELIMINATE CONING.

    SBIR Phase II 1989 Department of DefenseDefense Threat Reduction Agency
  4. UGT INSTRUMENTATION FOR ELECTRICAL PARAMETER MEASUREMENT

    SBC: APTEK, Inc.            Topic: N/A

    THIS PROGRAM WILL DEVELOP FIELD INSTRUMENTATION SUITABLE FOR USE IN AN UNDERGROUND (UGT) OR ABOVEGROUND (AGT) RADIATION TEST ENVIRONMENT, FOR THE MEASUREMENT OF ELECTRICAL PROPERTIES OF MATERIALS AS THEY RECOVER FROM IRRADIATION. THE EFFORT WILL CONSIST OF SAMPLE HOLDER AND INSTRUMENTATION DESIGN, RESPONSE ANALYSIS, AND THE FABRICATION OF A LABORATORY TEST SETUP TO SHOW TECHNIQUE FEASIBILITY.

    SBIR Phase II 1991 Department of DefenseDefense Threat Reduction Agency
  5. SENSITIVE LOW Z STRAIN GAGE

    SBC: APTEK, Inc.            Topic: N/A

    THIS ACTIVITY WILL INVESTIGATE THE USE OF PVDF FILM FOR USE AS A LOW Z STRAIN GAGE. THE PVDF MATERIAL IS AN ORDER OF MAGNITUDE MORE SENSITIVE THAN PZT AS A PIEZOELECTRIC MATERIAL AND HAS AN ATOMIC NUMBER MUCH LOWER (LOW Z) THAN PRESENT RESISTIVE STRAIN GAGE MATERIALS. THEREFORE, PVDF AS A STRAIN GAGE WILL BE CAPABLE OF MEASURING MUCH LOWER LEVELS OF STRAIN THAN PRESENT GAGING TECHNIQUES, AND WILL ...

    SBIR Phase II 1991 Department of DefenseDefense Threat Reduction Agency
  6. Eulerian Non-Reflecting Boundary for Structure-Bubble Interaction Involving Near Field Convention Explosions

    SBC: APTEK, Inc.            Topic: N/A

    CURRENT COROPUTER ANALYSIS OF BUBBLE-SUBMERGED STRUCTURE INTERACTION, DUE TO CONVENTIONAL WEAPONS, IS EXTREMELY RESOURCE INTENSIVE. THEREFORE, IT IS VERY DIFFICULT TO REPLACE FULL SCALE LIVE FIRE TESTING OF SUBMERGED STRUCTURE WITH SCALE TESTING OF SUBMERGED STRUCTURES AND COMPUTER ANALYSIS. THE GOAL OF THIS EFFORT IS TO DEVELOP AN ACCURATE AND EFFICIENT NON-REFLECTING BOUNDARY FOR EULERIAN HYDROD ...

    SBIR Phase I 1993 Department of DefenseDefense Threat Reduction Agency
  7. Composite Retrofit Technicques for Blast Resistance

    SBC: APTEK, Inc.            Topic: N/A

    This Small Business Innovation Research Project will determine the advantages and disad-vantages of fibrous/polymeric composite materials over traditional material (steel) for retrofitting key civilian facilities against terrorist bomb attack. Retrofit techniques we will evaluate are: strengthening fully and partially exposed columns with composite wraps or shells, masonry walls with bonded comp ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  8. N/A

    SBC: APTEK, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseDefense Threat Reduction Agency
  9. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase I 2001 Department of Transportation
  10. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase II 2004 Department of Transportation
US Flag An Official Website of the United States Government