List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. A HIGH TEMPERATUE WARNING SWITCH FOR ENGINE COOLING SYSTEMS IS CONCEIVED WHICH PROVIDES WARNING AT A RELATIVELY LOWER TEMPERATURE LEVEL (E.

    SBC: Index Industries Inc            Topic: N/A

    A HIGH TEMPERATUE WARNING SWITCH FOR ENGINE COOLING SYSTEMS IS CONCEIVED WHICH PROVIDES WARNING AT A RELATIVELY LOWER TEMPERATURE LEVEL (E.G. 212 DEGREE FAHRENHEIT) IF THE SYSTEM PRESSURE IS BELOW 7 PSIG AND AT A HIGHER TEMPERATURE LEVEL (E.G. 225 DEGREES FAHRENGEIT) IF THE SYSTEM PRESSURE IS ABOVE 7 PSIG. IN THE EVENT OF COOLING SYSTEM PRESSURE LOSS, THIS DUAL-LEVEL, PRESSURE DEPENDENT WARNING SW ...

    SBIR Phase I 1986 Department of DefenseArmy
  2. MINIATURE ORTHOGONAL MAGNETIC SENSOR

    SBC: KVH INDUSTRIES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseNavy
  3. CONTINUOUS EXPLOSIVE TUNNELING SYSTEM

    SBC: Machine Design Engineers,            Topic: N/A

    THE NEED EXISTS FOR AN ADVANCEMENT IN EXPLOSIVE EXCAVATION METHODS TO IMPROVE THE EXISTING CYCLIC PROCESS. PHASE I OF THIS PROJECT WILL PROVE FEASIBILITY OF AN INNOVATIVE EXPLOSIVES EXCAVATION SYSTEM WHICH WILL COMBINE THE AUTOMATION OF TUNNEL BORING MACHINES WITH THE LOW ENERGY AND FLEXIBILITY OF EXPLOSIVES. THE SYSTEM WILL INCLUDE A CONTINUOUS, CONCURRENT CYCLE OF DRILLING LOADING, BLASTING AND ...

    SBIR Phase II 1986 Department of DefenseAir Force
  4. THE PURPOSE OF THIS STUDY IS TO INTEGRATE THE APPLICABLE FIELD, DEPOT AND OTHER AIR FORCE MAINTENANCE DATA INTO A SINGLE AND CONCISE MAINTENANCE HISTORY OR BASIC DATA PACKAGE.

    SBC: Management Support Services            Topic: N/A

    THE PURPOSE OF THIS STUDY IS TO INTEGRATE THE APPLICABLE FIELD, DEPOT AND OTHER AIR FORCE MAINTENANCE DATA INTO A SINGLE AND CONCISE MAINTENANCE HISTORY OR BASIC DATA PACKAGE. THIS PACKAGE OR HISTORY IS DESIGNED TO CONTAIN THE INFORMATION REQUIRED BY ALL OF THE USING DISCIPLINES, TO INCLUDE ALL OF THE CONTRIBUTING MAINTENANCE LEVELS (HARDWARE REPAIR, REMOVE AND REPLACE, CHECKED OK, ETC) AND, FINAL ...

    SBIR Phase I 1986 Department of DefenseAir Force
  5. AN ALUMINUM RIVET FOR USE ABOVE 500 DEG F DEVELOPMENT

    SBC: Measurement Technologies            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  6. THROUGH 50 CALIBER CARTRIDGE BRASS CUP DIMENSIONS AND HARDNESS

    SBC: Mohr And Associates            Topic: N/A

    THE U.S. ARMY'S SMALL CALIBER AMMUNITION MODERNIZATION PROGRAM (SCAMP) CARTRIDGE BRASS (70/30) CUP INSPECTION IS CURRENTLY A MANUAL PROCESS THAT IS BASED ON THE DIMENSIONAL AND HARDNESS (OR GRAIN SIZE( MEASUREMENTS OF SAMPLES FROM EACH CUP LOT. IN THIS PROPOSED WORK, TESTING WITH LABORATORY MOCKUPS WOULD EVALUATE THE MOST PROMISING SENSING TECHNIQUES FOR THE MEASUREMENT OF CUP DIMENSIONS AND HARDN ...

    SBIR Phase I 1986 Department of DefenseArmy
  7. EFFECT OF PRINT ON DEMAND CAPABILITIES ON DOCUMENTATION MANAGEMENT

    SBC: Pacific Western Services            Topic: N/A

    A PRINT ON DEMAND (POD) CAPABILITY HAS A MAJOR POTENTIAL IN AN ENVIRONMENT WHERE A LARGE VARIETY OF FORMS ARE PREPARED RANDOMLY, OFTEN FROM AN AUTOMATED DATABASE. POD EQUIPMENT CCAN PERMIT COMMON ITEMS FROM THE DATABASE TO BE PRE-INSERTEDON A VISUAL DISPLAY TERMINAL (VDT) FOR THE CLERK, ELIMINATT ELIMINATING REDUNDANT KEY STROKING, REDUCING ERRORS, REDUCING FORM COST AND MAINTENANCE, AND MINIMIZIN ...

    SBIR Phase II 1986 Department of DefenseNavy
  8. SPEAKER VARIATIONS IN VOICE COMMAND SYSTEMS

    SBC: Phonetigraphics Inc            Topic: N/A

    A NOVEL SIGNAL PROCESSING AND PHONETIC ANALYSIS SYSTEM OPERATING IN THE TIME DOMAIN IS PROPOSED WHICH AVOIDS THE COSTLY AND TIMECONSUMING MATHEMATICAL SOFTWARE FILTERING SCHEMES OFTEN USED. THE PITCH SYNCHRONOUS RATIOMETRIC FACTORS REPRESENTING PHONEMIC ELEMENTS OF SPEECH ARE SEPARATED FROM THE SPORADIC NOISE AND CERTAIN PERSONALITY VARIABLE FEATURES. THE PURIFIED STRING OF ENCODED PHONETIC ELEMEN ...

    SBIR Phase I 1986 Department of DefenseArmy
  9. FEASIBILITY STUDY

    SBC: Ramp Corp            Topic: N/A

    RAMP CORPORATION PROPOSES TO ACCOMPLISH PERFORMANCE EVALUATION ON MICROCOMPUTER BASED EXPERT SYSTEMS FOR THE PURPOSE OF SELECTING A SYSTEM APPROPRIATE FOR USE IN FEDERAL CONTRACT MANAGEMENT SUPPORT. THE PROJECT OUTPUTS WILL BE A DEMONSTRATION MODULE FOCUSED ON CONTRACT CHANGES AND A FINAL REPORT WHICH DOCUMENTS THE SELECTION PROCESS AND PERFORMANCE EVALUATION CRITERIA UTILIZED IN THE EFFORT. THE E ...

    SBIR Phase I 1986 Department of DefenseDefense Advanced Research Projects Agency
  10. THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF

    SBC: Ribi Immunochem Research, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A VACCINE DELIVERY SYSTEM WHICH WILL STIMULATE, RAPIDLY, A STATE OF NON-SPECIFIC PROTECTION WHILE IT ENHANCES THE SPECIFIC IMMUNE RESPONSE TO THE VACCINE AND SHORTENS THE INDUCTION PERIOD FOR DEVELOPMENT OF SPECIFIC IMMUNITY. THIS WILL BE ACCOMPLISHED BY PREPARING THE VACCINE IN AN OILIN-WATER EMULSION THAT CONTAINS NON-TOXIC IMMUNOSTIMULATORS OF MICROBI ...

    SBIR Phase I 1986 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government